General view of the site looking north showing the Smelter at upper centre, and the Graving Dock and Wharf at lower centre. Taken from a helicopter on Wednesday, April 1, 1953.
General view of the site looking north showing the Smelter at upper centre, and the Graving Dock and Wharf at lower centre. Taken from a helicopter on Wednesday, April 1, 1953.
Photograph - aerial view of graving dock showing rough outline of excavation, Access Road into Dock at North West corner, and shovels, double handling base material.
Photograph - aerial view of graving dock showing rough outline of excavation, Access Road into Dock at North West corner, and shovels, double handling base material.
Aerial view of Graving Dock showing rough outline of excavation, Access Road into Dock at North West corner, and shovels, double handling base material.
Aerial view of Graving Dock showing rough outline of excavation, Access Road into Dock at North West corner, and shovels, double handling base material.
Photo showing aerial view of the graving dock looking north showing caisson contruction nearing its final stages, the smelter site is in the background.
Photo showing aerial view of the graving dock looking north showing caisson contruction nearing its final stages, the smelter site is in the background.
Jamieson came to Kitimat from Vancouver to work on the Alcan project in 1952. With his first pay cheque he bought a small "Pony Kodak" camera at the local store (Hudson Bay?), and started taking coloured slides of the Kitimat from 1952-1953. Left Kitimat at the end of August 1953 to move to Montreal.
Scope and Content
Slide of graving dock. Kitimat. Mount Elizabeth visible in background.
Photographs of graving dock - caissons are built in a huge hole and then floated out to a stationary position and sunk. This is then the base of the wharf. Photo shows construction area with framework, and people working in a pit.
Fred DeLory worked for Arvida P.Q. and was transferred to Kitimat at the beginning of 1952. He was the first town engineer.
Scope and Content
Photographs of graving dock - caissons are built in a huge hole and then floated out to a stationary position and sunk. This is then the base of the wharf. Photo shows construction area with framework, and people working in a pit.