Photo showing potroom 2C looking west showing placing of precast air duct partition walls and concrete fill in foreground and precast air duct covers in background, sub slabs and finished floor along sides of building.
Photo showing potroom 2C looking west showing placing of precast air duct partition walls and concrete fill in foreground and precast air duct covers in background, sub slabs and finished floor along sides of building.
photo showing view looking view behind the wharf caissons looking north showing placing of sand blanket over the rock backfill at right of the outlet of the Dredge Pipe at left.
photo showing view looking view behind the wharf caissons looking north showing placing of sand blanket over the rock backfill at right of the outlet of the Dredge Pipe at left.
Photo showing view of the temporary wharf area looking southeast, scow grid in front of crane at elft, cement silos centre and transit ware-house at right.
Photo showing view of the temporary wharf area looking southeast, scow grid in front of crane at elft, cement silos centre and transit ware-house at right.
Photo showing view looking toward site of Pernament Wharf from south dike of graving dock, dredge and dragon line excavating channel from graving dock to deep water, truck dumping gravel for foundation blanket into bottom dump scow.
Photo showing view looking toward site of Pernament Wharf from south dike of graving dock, dredge and dragon line excavating channel from graving dock to deep water, truck dumping gravel for foundation blanket into bottom dump scow.
Photo showing view looking north west showing coal and coke bine adjacent to the carbon paste plant with truck dumping coke into hopper for feeding into the plant.
Photo showing view looking north west showing coal and coke bine adjacent to the carbon paste plant with truck dumping coke into hopper for feeding into the plant.
Photo showing view of the Carbon Paste Plant looking eat, smoke from stack showing first equipment in operation, erection of trusses for Conveyor C20 in progress.
Photo showing view of the Carbon Paste Plant looking eat, smoke from stack showing first equipment in operation, erection of trusses for Conveyor C20 in progress.
Photo showing general view of the site of Potlines #3 and 4 looking south east, Moore creek channel in foreground and dredge pipe discharging at left centre.
Photo showing general view of the site of Potlines #3 and 4 looking south east, Moore creek channel in foreground and dredge pipe discharging at left centre.
Photo showing steel transformers and other machinery in storage yard during winter with construction offices on site incluidng storage buildings and potrooms.
Photo showing steel transformers and other machinery in storage yard during winter with construction offices on site incluidng storage buildings and potrooms.