Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212
Photograph of a view of the Alcan smelter. Photo is taken from up on a hill with fireweed. View is looking east. Eastuary is visible behind the smelter. Beyond that is the channel and mountains. Low mountains have sections of clearcut. Mount Elizabeth in background.
Photograph of a view of the Alcan smelter. Photo is taken from up on a hill with fireweed. View is looking east. Eastuary is visible behind the smelter. Beyond that is the channel and mountains. Low mountains have sections of clearcut. Mount Elizabeth in background.