D7 and H3 house. Living room, fireplace and hall leading to entrance hall and bathroom on right, furnace (grill enclosed), two bedrooms to left, and one bedroom at end of hallway.
D7 and H3 house. Living room, fireplace and hall leading to entrance hall and bathroom on right, furnace (grill enclosed), two bedrooms to left, and one bedroom at end of hallway.
View looking northwest of pile driving operations for timber bridge across Road "N" in Neighbourhood "C". Note Townsite Contractors lumber storage yard in background.
View looking northwest of pile driving operations for timber bridge across Road "N" in Neighbourhood "C". Note Townsite Contractors lumber storage yard in background.
Flood looking upstream of Neighbourhood C Drainage Canal from approx. station 25/00. Note silt etc. in canal. Section of canal in immediate foreground was cut to shape just prior to the flood.
Flood looking upstream of Neighbourhood C Drainage Canal from approx. station 25/00. Note silt etc. in canal. Section of canal in immediate foreground was cut to shape just prior to the flood.