Photo depicts six people standing on the Kemano Wharf. From left is Mr. K. Roestad; Mr. Percy E. Radley; Mr. McNeely DuBose; Mrs. McNeely DuBose; Mr. M.K. Madsen, M.K. Assistant Project Manager and Mr. R.E. Reed, M.K. Area Engineer.
Photo depicts six people standing on the Kemano Wharf. From left is Mr. K. Roestad; Mr. Percy E. Radley; Mr. McNeely DuBose; Mrs. McNeely DuBose; Mr. M.K. Madsen, M.K. Assistant Project Manager and Mr. R.E. Reed, M.K. Area Engineer.
Photo depicts the men in charge of operations. From left is Vice President A.W. Whitaker Jr. seen sitting in a helicopter; Project Manager Percy E. Radley; Chief Resident Engineer John Kendrick. The three men are all taking a look at what could be a map.
Photo depicts the men in charge of operations. From left is Vice President A.W. Whitaker Jr. seen sitting in a helicopter; Project Manager Percy E. Radley; Chief Resident Engineer John Kendrick. The three men are all taking a look at what could be a map.
Photo depicts seven International L-190 trucks, complete with Jaeger ready-mix concrete machines. These trucks were the first installment of a large fleet at Kitimat.
Photo depicts seven International L-190 trucks, complete with Jaeger ready-mix concrete machines. These trucks were the first installment of a large fleet at Kitimat.
Notes
Title based on content of photograph. -- International Harvester Company No. C 6101. -- Photographed by the International Harvester Company, manufacturers of construction equipment purchased for the Project. -- In early July these trucks were waiting for the completion of the batching plant installation. The trucks carried concrete directly to the new smelter in the townsite and assisted in all other town and smelter construction. -- The batch plant was located at "Gravel Mountain" - the sandhill. Hal Whiting Collection 985.65.107