Photo depicts the welcome sign for Kitimat on the wharf that greeted all workers to the Kitimat Project upon their arrival by boat.
Notes
Title based on content of photograph. -- Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.113
Photo depicts an aerial view of the smeltersite main camp showing married quarters, sternwheeler Delta King, hydraulic fill in progress, recreation building, hospital, power plant, sawmill and water tank.
Photo depicts an aerial view of the smeltersite main camp showing married quarters, sternwheeler Delta King, hydraulic fill in progress, recreation building, hospital, power plant, sawmill and water tank.
Notes
Title based on content of photograph. -- Alcan ID Numbers BC-2-243 and ACM-24311. Alcan Collection 78.11.32
Photo depicts a barge loaded with muck dredged from the wharf area. The International TD-9 dozer boat on the barge was there to push loads off as the barge was moved along.
Photo depicts a barge loaded with muck dredged from the wharf area. The International TD-9 dozer boat on the barge was there to push loads off as the barge was moved along.
Notes
Title based on content of photograph. -- International Harvester Company ID No. C 6039. International Harvester Company manufacturerd construction equipment purchased for the Project. -- Dredging at the wharf area provided sufficient water space for large ships to dock. Muck was dumped onto these barges by the clamshell bucket and towed out to deep water. Hal Whiting Collection 985.65.123
Photo depicts bulldozers placing fill in the south-west corner of the storage area, to the final elevation of 28.5 ft. View is looking north-east at storage area of hydraulic fill.
Photo depicts bulldozers placing fill in the south-west corner of the storage area, to the final elevation of 28.5 ft. View is looking north-east at storage area of hydraulic fill.
Notes
Title based on content of photograph. Alcan Collection 79.31.7
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212
Photo depicts workers excavating for the construction of the alumina storage building.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-451. -- Sloping sides avoided cave-ins. -- Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.267
Photo depicts the newly constructed dock, Terminal Wharf No. 1. View looking south-west from a point on the graving dock. Hydraulic fill dredge pipeline in the foreground running along at water level.
Photo depicts the newly constructed dock, Terminal Wharf No. 1. View looking south-west from a point on the graving dock. Hydraulic fill dredge pipeline in the foreground running along at water level.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-846. -- Note progress of conveyor gallery steel, kangaroo crane and pneumatic unloading equipment. Alcan Collection 78.11.68