Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Alcan smelter employees returning to work after layoffs due to a tunnel closure in Kemano. (Rock fall in Kemano tunnel: 65' long, 140' high, 125 cubic yards of material had moved. Tunnel closure caused Alcan plant closure. Took a "dewatering" of tunnel to repair rock fall). Employee Eric Burr first through gate.
Alcan smelter employees returning to work after layoffs due to a tunnel closure in Kemano. (Rock fall in Kemano tunnel: 65' long, 140' high, 125 cubic yards of material had moved. Tunnel closure caused Alcan plant closure. Took a "dewatering" of tunnel to repair rock fall). Employee Eric Burr first through gate.
Group photo taken on Aug 3 1951 on occasion of visit of President and Party to South Camp (Nathanael V. Davis, President Aluminum Limited; Mcneely DuBose, VP Alcan; R.E. Powell, President Alcan; Percy E. Radley, British Columbia Project Manager) October 8 1951
1 photograph, b&w ; 17 x 12 cm
1 photograph, b&w ; 24 x 19 cm
Scope and Content
Group photo taken on Aug 3 1951 on occasion of visit of President and Party to South Camp (Nathanael V. Davis, President Aluminum Limited; Mcneely DuBose, VP Alcan; R.E. Powell, President Alcan; Percy E. Radley, British Columbia Project Manager) October 8 1951