Skip header and navigation

Revise Search

3 records – page 1 of 1.

Alcan Employees Returning to Work.

https://collections.kitimatmuseum.ca/en/permalink/description9293
Part Of
Max Patzelt fonds
Description Level
Item
GMD
graphic material
Date Range
[ca. 9 or 12 Sept 1961]
Accession Number
1998.1.8270
Scope and Content
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Part Of
Max Patzelt fonds
Creator
Patzelt, Max
Description Level
Item
Accession Number
1998.1.8270
GMD
graphic material
Date Range
[ca. 9 or 12 Sept 1961]
Physical Description
1 photograph and 1 negative : b&w
Scope and Content
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Notes
Old Accession No. 987.26.84 B
Subject Access
Kemano
Alcan Smelters & Chemicals Ltd.

Laid off Alcan Employees Returning to Work

https://collections.kitimatmuseum.ca/en/permalink/description9292
Part Of
Max Patzelt fonds
Description Level
Item
GMD
graphic material
Date Range
[ca. 9/12 Sept 1961]
Accession Number
1998.1.8269
Scope and Content
Alcan smelter employees returning to work after layoffs due to a tunnel closure in Kemano. (Rock fall in Kemano tunnel: 65' long, 140' high, 125 cubic yards of material had moved. Tunnel closure caused Alcan plant closure. Took a "dewatering" of tunnel to repair rock fall). Employee Eric Burr first through gate.
Part Of
Max Patzelt fonds
Creator
Patzelt, Max
Description Level
Item
Accession Number
1998.1.8269
GMD
graphic material
Date Range
[ca. 9/12 Sept 1961]
Physical Description
1 photograph and 1 negative : b&w
Scope and Content
Alcan smelter employees returning to work after layoffs due to a tunnel closure in Kemano. (Rock fall in Kemano tunnel: 65' long, 140' high, 125 cubic yards of material had moved. Tunnel closure caused Alcan plant closure. Took a "dewatering" of tunnel to repair rock fall). Employee Eric Burr first through gate.
Notes
Old Accession No. 987.26.84 A
Name Access
Burr, Eric
Subject Access
Alcan Smelters & Chemicals Ltd.

Passenger Ship "Prince George"

https://collections.kitimatmuseum.ca/en/permalink/description9300
Part Of
Max Patzelt fonds
Description Level
Item
GMD
graphic material
Date Range
[ca. 10 Aug 1961]
Accession Number
1998.1.8277
Scope and Content
Passenger ship "Prince George" at Alcan Dock
Part Of
Max Patzelt fonds
Creator
Patzelt, Max
Description Level
Item
Accession Number
1998.1.8277
GMD
graphic material
Date Range
[ca. 10 Aug 1961]
Physical Description
1 photograph and 1 negative: b&w
Scope and Content
Passenger ship "Prince George" at Alcan Dock
Notes
Old Accession No. 987.26.88 A
Subject Access
Alcan Smelters & Chemicals Ltd.
Dock