Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Alcan smelter employees returning to work after layoffs due to plant shut down caused by a rock slide in Kemano tunnel. (Rock Fall in the Kemano Power tunnel 65' long, 140' high, and 125 cubic yards of material) cut off power to Kitimat plant. Only after a dewatering of the tunnel, was power restored.
Alcan smelter employees returning to work after layoffs due to a tunnel closure in Kemano. (Rock fall in Kemano tunnel: 65' long, 140' high, 125 cubic yards of material had moved. Tunnel closure caused Alcan plant closure. Took a "dewatering" of tunnel to repair rock fall). Employee Eric Burr first through gate.
Alcan smelter employees returning to work after layoffs due to a tunnel closure in Kemano. (Rock fall in Kemano tunnel: 65' long, 140' high, 125 cubic yards of material had moved. Tunnel closure caused Alcan plant closure. Took a "dewatering" of tunnel to repair rock fall). Employee Eric Burr first through gate.
Photo depicts passengers disembarking from the boat and seaplane docked at the wharf of the float camp on the Kildala Arm of Gardner Canal. Seen in the background is Dala Heights and the route of the transmission line.
Photo depicts passengers disembarking from the boat and seaplane docked at the wharf of the float camp on the Kildala Arm of Gardner Canal. Seen in the background is Dala Heights and the route of the transmission line.
Notes
Title based on content of photograph. -- Alcan ID No. KR-811. Alcan Collection