Photograph showing the unloading of a prefabricated section of the new bunkhouse at the motel site. This section is one third of an elevan - man bunkhouse.
Photograph showing the unloading of a prefabricated section of the new bunkhouse at the motel site. This section is one third of an elevan - man bunkhouse.
Photograph of view of the 11 man bunkhouses at the back of the motel site. Roofing is now being placed. These are prefab. units - went up in 6 days from dockside. Logs are laid in the foreground.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of view of the 11 man bunkhouses at the back of the motel site. Roofing is now being placed. These are prefab. units - went up in 6 days from dockside. Logs are laid in the foreground.
Photograph showing Permanent Camp, 5 bunkhouses and cafeteria. Drill rig on green coke storage hole. Area in foreground to be hydraulic filled. North-South Mole at elev. 21.5 awash in immediate foreground. Taken from North-South Mole.
Photograph showing Permanent Camp, 5 bunkhouses and cafeteria. Drill rig on green coke storage hole. Area in foreground to be hydraulic filled. North-South Mole at elev. 21.5 awash in immediate foreground. Taken from North-South Mole.
Photograph of sittingroom of upstairs suite in Guest House No. 1. Room contains a couch, chairs, tables, a lamp, and a brick fireplace. Door exiting the room is on the left.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of sittingroom of upstairs suite in Guest House No. 1. Room contains a couch, chairs, tables, a lamp, and a brick fireplace. Door exiting the room is on the left.
Aerial view of Graving Dock showing rough outline of excavation, Access Road into Dock at North West corner, and shovels, double handling base material.
Aerial view of Graving Dock showing rough outline of excavation, Access Road into Dock at North West corner, and shovels, double handling base material.