Slides of a Totem Pole at Gitsegucla (Skeena Crossing) and young Boys at the Skeena Crossing,a monument at the Skeena Crossing, an old abandoned log cabin at the Bulkley Station, end of President Trail, and a Totem Pole in the Kitamaat Village which was a gift from the Haida Eagle Clan to the Haisla Eagle Clan.
Slides of a Totem Pole at Gitsegucla (Skeena Crossing) and young Boys at the Skeena Crossing,a monument at the Skeena Crossing, an old abandoned log cabin at the Bulkley Station, end of President Trail, and a Totem Pole in the Kitamaat Village which was a gift from the Haida Eagle Clan to the Haisla Eagle Clan.
Photographs of cedar bark preparation by Clara Bolton (24 Jun 1982), Robert Stewart carving a spoon (3 Jul 1982), and of the museum native plant garden (3 Jul 1982).
7 photograph prints : b&w ; 12.5 x 9cm
4 photograph prints : b&w ; 9 x 12.5cm
Custodial History
Photographs taken by James Tirrul-Jones in his role as museum curator.
Scope and Content
Photographs of cedar bark preparation by Clara Bolton (24 Jun 1982), Robert Stewart carving a spoon (3 Jul 1982), and of the museum native plant garden (3 Jul 1982).
Notes
982.87.2 to 20 (Missing 3 to 10) : R33-2 to R33-20 (Missing R33-3 to R33-10)
Possibly James Tirrul-Jones collection
Info cards were included in same envelope as photos. Possibly relating to neagtives.
Card 1: Eulachon Harvest Kemano early May. Totem pole. No Print. Totem pole Kemano close-up Neg# R17-71 Acc# 982.53.8
Card 2: Eulachon nets. No print. Neg# R17-15 Acc# 982.53.15B
Three cassette tapes contain recordings of Jeff Legaik speaking, telling Haisla stories. Tape one - Grpsaxtlaga historical story, GoGitwvn frog story Xaisla, GoGitwvn frog story Haida, Gitwvn stories copied. 1. Haida song of Gitwvnstaz, 10. Gitwvn frog story (English), Legaik Carpenter story copied, 10. Carpenter story Xaisla, 60. Carpenter lullaby Xaisla for babies who will be carpenters, 65. Carpenter story English. Tape two - Continued Haisla stories, copied Legaic Carpenter story 1-100, founding of Kitamaat, Haistal first translation English of Chief Jasee and Legaic. Tape 3 - Tsum-gwis story Haisla lngual 1-30, english translation 30-40, Abuux-dla-lumgwaxs story in Haisla language. English translation of Abuux-dla-lumgwaxs 1-35. Three cassette copies, three digital cd copies. Textual records consist of typewritten and hand-edited versions of the stories on the tapes, by Gisela Mendel.
Museum curator Gisela Mendel recorded Jeff Legaik (Haisla Chief) telling Haisla stories. She then transcribed the tapes, then created 'Kitamaat Stories'. The tapes were copied onto new cassettes. In 2015 the recordings were digitized onto cds.
Scope and Content
Three cassette tapes contain recordings of Jeff Legaik speaking, telling Haisla stories. Tape one - Grpsaxtlaga historical story, GoGitwvn frog story Xaisla, GoGitwvn frog story Haida, Gitwvn stories copied. 1. Haida song of Gitwvnstaz, 10. Gitwvn frog story (English), Legaik Carpenter story copied, 10. Carpenter story Xaisla, 60. Carpenter lullaby Xaisla for babies who will be carpenters, 65. Carpenter story English. Tape two - Continued Haisla stories, copied Legaic Carpenter story 1-100, founding of Kitamaat, Haistal first translation English of Chief Jasee and Legaic. Tape 3 - Tsum-gwis story Haisla lngual 1-30, english translation 30-40, Abuux-dla-lumgwaxs story in Haisla language. English translation of Abuux-dla-lumgwaxs 1-35. Three cassette copies, three digital cd copies. Textual records consist of typewritten and hand-edited versions of the stories on the tapes, by Gisela Mendel.
Photographs showing important Ocelot staff members such as E.T (ED) Cotton (Ocelot Field Construction Manager), Roy Fisher (Vice President of Ocelot Industries Limited), Bob Kelly (Technical Manager), & Bill Eynon (Ocelot Manager). There are also photographs of other unknown workers.
14 photograph prints : color
1 photograph print : b&w
13 negatives
Custodial History
Photographs taken by Max Patzelt.
Scope and Content
Photographs showing important Ocelot staff members such as E.T (ED) Cotton (Ocelot Field Construction Manager), Roy Fisher (Vice President of Ocelot Industries Limited), Bob Kelly (Technical Manager), & Bill Eynon (Ocelot Manager). There are also photographs of other unknown workers.
Negatives showing Eurocan people posing for a photo and at a dinner gathering at The Chalet in Kitimat. There is also images of workers working at the mill.
Negatives showing Eurocan people posing for a photo and at a dinner gathering at The Chalet in Kitimat. There is also images of workers working at the mill.
John Ware was a past employee of the Kitimat Town Planning Department (1957-1959). He was hired by Hollister Kent, Planning Director for Kitimat. During his two years here, Dr. ware designed the first Kitimat street signs, the Haisla Boulevard overpass, and the Hirsch Creek Park shelter centennial project (1858-1958). He was layed off when Alcan lost major Aluminum buyers and the town expansion halted, resulting in a cut back of Kirtimat employees. He then moved to the USA.
Custodial History
Donated by John Ware.
Scope and Content
Photographs of the Haisla Boulevard pedestrian walkway bridge. Photos include bridge before centre support was installed, and after.
Notes
Further info on the walkway bridge - the pedestrian overpass was designed by John Ware to carry people, heavy wet snow loads and walkway snow plow, with a large saftey factor. The central span was designed as the maximum length of concrete double 'Tee' beam that could be carried on an open flatbed railroad car through the Canadian Rocky Mountains. The pre-stressed central span was supported on each end by poured reinforced concrete cantilevers built clear of the multi-lane highway. Initial structural calculations were done out by the very capable Kitimat Town Engineer Graydon. His calculations were checked by Kitimat's consulting engineering firm in Vancouver. Ware's design and the engineer's calculations were then sent to a pre-stressed concrete manufacturer in Calgary. When the beam arrived it was properly installed between the two cantilevers, and metal handrails were added just before the winter snow arrived. The bridge was deseigned to self support without any needed centre support. However, when city officials saw the light looking long span walkway bridge they decided that it was too fragile and that a column must be placed at mid span to give it adequate support. This decision would result in a fatal vehicle accident, as wet snows caused a driver to lose control and crash into it.
John Ware was a past employee of the Kitimat Town Planning Department (1957-1959). He was hired by Hollister Kent, Planning Director for Kitimat. During his two years here, Dr. ware designed the first Kitimat street signs, the Haisla Boulevard overpass, and the Hirsch Creek Park shelter centennial project (1858-1958). He was layed off when Alcan lost major Aluminum buyers and the town expansion halted, resulting in a cut back of Kirtimat employees. He then moved to the USA.
Custodial History
Donated by John Ware.
Scope and Content
Photographs of the Haisla Boulevard pedestrian walkway bridge concept.
Preliminary sketch design for walkway bridge over 4 lane divided highway. Designed by Jack Ware in collaboration with:
Kitimat municipal structural engineer-Bryan Graydon
Kitimat municipal structural engineering consultants-Vancouver
Note
Center prestressed beam is supported by the cantilevered beams at each end
Prestressed beam was the longest beam that could be carried on a rail flatbed car across tocky mountains in 1958
Design of supports was simplified to round columns for ease of construction
Notes
Further info on the walkway bridge - the pedestrian overpass was designed by John Ware to carry people, heavy wet snow loads and walkway snow plow, with a large saftey factor. The central span was designed as the maximum length of concrete double 'Tee' beam that could be carried on an open flatbed railroad car through the Canadian Rocky Mountains. The pre-stressed central span was supported on each end by poured reinforced concrete cantilevers built clear of the multi-lane highway. Initial structural calculations were done out by the very capable Kitimat Town Engineer Graydon. His calculations were checked by Kitimat's consulting engineering firm in Vancouver. Ware's design and the engineer's calculations were then sent to a pre-stressed concrete manufacturer in Calgary. When the beam arrived it was properly installed between the two cantilevers, and metal handrails were added just before the winter snow arrived. The bridge was deseigned to self support without any needed centre support. However, when city officials saw the light looking long span walkway bridge they decided that it was too fragile and that a column must be placed at mid span to give it adequate support. This decision would result in a fatal vehicle accident, as wet snows caused a driver to lose control and crash into it.