Photo showing Vancouver Tug and Barge Co. Marine Towing Equipment moored at temporary wharf, the tugs ``Ladene`` and ``Labelle`` were used during towing, careening and placing of caissons.
Photo showing Vancouver Tug and Barge Co. Marine Towing Equipment moored at temporary wharf, the tugs ``Ladene`` and ``Labelle`` were used during towing, careening and placing of caissons.
Alcan smelter employees returning to work after layoffs due to a tunnel closure in Kemano. (Rock fall in Kemano tunnel: 65' long, 140' high, 125 cubic yards of material had moved. Tunnel closure caused Alcan plant closure. Took a "dewatering" of tunnel to repair rock fall). Employee Eric Burr first through gate.
Alcan smelter employees returning to work after layoffs due to a tunnel closure in Kemano. (Rock fall in Kemano tunnel: 65' long, 140' high, 125 cubic yards of material had moved. Tunnel closure caused Alcan plant closure. Took a "dewatering" of tunnel to repair rock fall). Employee Eric Burr first through gate.
Photo showing aerial view of the graving dock looking north showing caisson contruction nearing its final stages, the smelter site is in the background.
Photo showing aerial view of the graving dock looking north showing caisson contruction nearing its final stages, the smelter site is in the background.