Photo depicts an aerial view of Kitimat, seen is land cleared for Neighbourhood "D" and the Whitesail neighbourhood under construction, right foreground. The Alcan smelter and channel are in the background.
Photo depicts an aerial view of Kitimat, seen is land cleared for Neighbourhood "D" and the Whitesail neighbourhood under construction, right foreground. The Alcan smelter and channel are in the background.
Notes
Title based on content of photograph. Max Patzelt Collection - 1998.1.8351
Photo depicts the men in charge of operations. From left is Vice President A.W. Whitaker Jr. seen sitting in a helicopter; Project Manager Percy E. Radley; Chief Resident Engineer John Kendrick. The three men are all taking a look at what could be a map.
Photo depicts the men in charge of operations. From left is Vice President A.W. Whitaker Jr. seen sitting in a helicopter; Project Manager Percy E. Radley; Chief Resident Engineer John Kendrick. The three men are all taking a look at what could be a map.
Image depicts a humorous reprieve certificate given to employees of the Alcan Project. The content also implies the hardships endured by the Morrison-Knudsen Company workers in Kemano.
Image depicts a humorous reprieve certificate given to employees of the Alcan Project. The content also implies the hardships endured by the Morrison-Knudsen Company workers in Kemano.
Notes
Title based on contents of text. Ernie Archer Collection
Photo depicts six people standing on the Kemano Wharf. From left is Mr. K. Roestad; Mr. Percy E. Radley; Mr. McNeely DuBose; Mrs. McNeely DuBose; Mr. M.K. Madsen, M.K. Assistant Project Manager and Mr. R.E. Reed, M.K. Area Engineer.
Photo depicts six people standing on the Kemano Wharf. From left is Mr. K. Roestad; Mr. Percy E. Radley; Mr. McNeely DuBose; Mrs. McNeely DuBose; Mr. M.K. Madsen, M.K. Assistant Project Manager and Mr. R.E. Reed, M.K. Area Engineer.
Photo depicts two barges moored in Douglas Channel and loaded with flat-top house sections for construction workers and their families.
Notes
Title based on content of photograph. -- Temporary housing destined for Kitimat was assembled at Vancouver Tug and Barge below the Lion's Gate Bridge in three sections, then barged to Kitimat - 10 houses or 30 sections on each barge. -- Electrician Bill Frahler wired approximately 2,000 houses in Kitimat camps and townsite between 1954 and 1958, working first for Johnson-Crooks then Straits Construction, both U.S. contractors. Pat Jimenez Collection
Photo depicts a view of Minette Bay scow grid with two barges being unloaded. The left barge is loaded with Johnson Crooks materials and the right barge with Hullah Construction materials.
Photo depicts a view of Minette Bay scow grid with two barges being unloaded. The left barge is loaded with Johnson Crooks materials and the right barge with Hullah Construction materials.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-1061. Alcan Collection 78.11.89
Photo depicts the boardwalk between homes 36 and 32 on Finch Steet in the Nechako neighbourhood. View is north-east looking towards Nalabila Boulevard.
Photo depicts the boardwalk between homes 36 and 32 on Finch Steet in the Nechako neighbourhood. View is north-east looking towards Nalabila Boulevard.
Notes
Title based on content of photograph. -- This house type was called a "chicken coop". -- Photograph taken from Fulmar Street. Alcan Collection 73.3.6.1
Photo depicts the Last Spike Ceremony for the Canadian National Railway Terrace to Kitimat line. From left is Duncan K. Kerr, Vice President of Associated Boards of Trade of B.C.; S.F. Dingle, Vice President of C.N.R, seen here driving in the aluminum spike.; Major J.L. Charles, Chief Engineer, C.N.R. Western Region; and Percy E. Radley, Alcan Project Manager.
Photo depicts the Last Spike Ceremony for the Canadian National Railway Terrace to Kitimat line. From left is Duncan K. Kerr, Vice President of Associated Boards of Trade of B.C.; S.F. Dingle, Vice President of C.N.R, seen here driving in the aluminum spike.; Major J.L. Charles, Chief Engineer, C.N.R. Western Region; and Percy E. Radley, Alcan Project Manager.
Aerial of Kitimat's office building in the downtown area. The Royal Bank of Canada occupied the main floor, and Property and Power Operations for the Aluminum Company of Canada occupied an upper floor. Kildala Neighbourhood is shown in the background.
Aerial of Kitimat's office building in the downtown area. The Royal Bank of Canada occupied the main floor, and Property and Power Operations for the Aluminum Company of Canada occupied an upper floor. Kildala Neighbourhood is shown in the background.
Notes
Title based on content of photograph. Alcan Collection. Negative found in 2014.14 collection.
View of the audience and a portion of the Vancouver Symphony as they performed in the Mount Elizabeth Secondary School gym. Shows audience on gym floor as well as those in the bleachers.
1 photograph : b&w ; 25.3 x 20.3 cm
1 negative : b&w ; 12.6 x 10 cm
Scope and Content
View of the audience and a portion of the Vancouver Symphony as they performed in the Mount Elizabeth Secondary School gym. Shows audience on gym floor as well as those in the bleachers.