Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Smelter Site looking East. Precast yard and storage in foreground. Structural steel being erected in Service Buildings. Forms being placed for Building 153 and Rectifier Building 102. Trucks dumping backfill behind. Burning in Townsite Area left background.
Book titled "Aluminum Company of Canada, Ltd. Employee Training Division Montreal Trainee Manual", with a dark green cover, and an image of an aluminum ingot in the centre. Includes a letter from P. E. Radley to Mr. W.S. Mosher, explaining that this manual was sent as a sort of "guidebook" for British Columbia Employees, instead of a tour of the Eastern Canada plants.
Book titled "Aluminum Company of Canada, Ltd. Employee Training Division Montreal Trainee Manual", with a dark green cover, and an image of an aluminum ingot in the centre. Includes a letter from P. E. Radley to Mr. W.S. Mosher, explaining that this manual was sent as a sort of "guidebook" for British Columbia Employees, instead of a tour of the Eastern Canada plants.
Photograph of view of Kitimat River bridge looking west. East pier in foreground showing whalers in place with sheet piling driven to grade. Center pier-right-two bearingpiles driven to required bearing. Left-sixty foot pile in place for splicing. Temporary bridge-crew completing placing rock in pier.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view of Kitimat River bridge looking west. East pier in foreground showing whalers in place with sheet piling driven to grade. Center pier-right-two bearingpiles driven to required bearing. Left-sixty foot pile in place for splicing. Temporary bridge-crew completing placing rock in pier.