Photograph showing Haisla Bridge construction. Temp bridge with a vehicle on it is visible on the left. People working and machinery can be seen up on the bridge on the right.
Photograph showing Haisla Bridge construction. Temp bridge with a vehicle on it is visible on the left. People working and machinery can be seen up on the bridge on the right.
Notes
Photo is in two parts and taped together in the middle.
Photograph of Kitimat Branch construction - July 1953 ; Crossing of Sjeena River at Terrace ; Main channel is 100 ft. deep ; During annual spring run off period, all the area presently visible up to the south abutment is entirely inundated with swift flowing waters carrying logs and debris.
Photograph of Kitimat Branch construction - July 1953 ; Crossing of Sjeena River at Terrace ; Main channel is 100 ft. deep ; During annual spring run off period, all the area presently visible up to the south abutment is entirely inundated with swift flowing waters carrying logs and debris.