Permanent Camp, 5 bunkhouses and cafeteria. Drill rig on green coke storage hole. Area in foreground to be hydraulic filled. North-South Mole at elev. 21.5 awash in immediate foreground. Taken from North-South Mole.
Permanent Camp, 5 bunkhouses and cafeteria. Drill rig on green coke storage hole. Area in foreground to be hydraulic filled. North-South Mole at elev. 21.5 awash in immediate foreground. Taken from North-South Mole.
View of the gravel fill in place for some of the houses being erected by Hullah construction on Swallow Street. Note the prefabricated forms under erection in centre background.
View of the gravel fill in place for some of the houses being erected by Hullah construction on Swallow Street. Note the prefabricated forms under erection in centre background.
Photograph of fill material being placed on Lahakas Blvd. just north of Gyrfalcon St. This is part of the neighbourhood A-II major roads and is a minicipality responsibility. Dump truck dumping fill is on the left, and the driver has the door open and is looking out to the back.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of fill material being placed on Lahakas Blvd. just north of Gyrfalcon St. This is part of the neighbourhood A-II major roads and is a minicipality responsibility. Dump truck dumping fill is on the left, and the driver has the door open and is looking out to the back.