Steel reinforcing rods for concrete work arrive at Kitimat warf from Vancover by barges. A BE truck-mounted crane lifts them off and places them on the International L-190 trucks. Here is the way all supplies come into Kitimat at the present time.
Steel reinforcing rods for concrete work arrive at Kitimat warf from Vancover by barges. A BE truck-mounted crane lifts them off and places them on the International L-190 trucks. Here is the way all supplies come into Kitimat at the present time.
Photo depicts a view of Minette Bay scow grid with two barges being unloaded. The left barge is loaded with Johnson Crooks materials and the right barge with Hullah Construction materials.
Photo depicts a view of Minette Bay scow grid with two barges being unloaded. The left barge is loaded with Johnson Crooks materials and the right barge with Hullah Construction materials.