Molly worked + lived in Kitimat (1954-55). Worked at Alcan Pryde Machine Shop, last girl on Kitimat Constructors payroll. Liver at hospital, Smeltersite.
Scope and Content
Collection of photos consisting of Alcan, Smeltersite, Delta King, the sandhill, Kitimat River, Hirsch Creek bridge, Douglas Channel, and the wharf
Notes
Photos were most likely colour origianlly, but have degraded into a pink tone
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212
Photograph of showing the framing almost completed in Guest House No.2. Two men are visible working on it. Apartments visible behind, and townsite camp is to the left.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of showing the framing almost completed in Guest House No.2. Two men are visible working on it. Apartments visible behind, and townsite camp is to the left.
Photograph of #1 Guest House showing amdeck roofing in place. Two men are working on the roof, and two men are working on another structure on the left. Building material is laid on the ground around.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of #1 Guest House showing amdeck roofing in place. Two men are working on the roof, and two men are working on another structure on the left. Building material is laid on the ground around.
8 photos of Alcan Engineering. 1) Looking East From Centre Passageway Bldg 7B 2) Completed Roof Fan Walking on Potroom 8B West 3) Looking West in Potroom 8B West from Column Line 12 4) Potroom 8B East Looking East from Centre Passageway 5) General View of Progress of Work in Potline 8A East 6) Potroom 8B East Looking East from Centre Passageway 7) Looking East from Centre Passageway Bldg 8A 8) Looking West from Centre Passageway Bldg 8A
8 photos of Alcan Engineering. 1) Looking East From Centre Passageway Bldg 7B 2) Completed Roof Fan Walking on Potroom 8B West 3) Looking West in Potroom 8B West from Column Line 12 4) Potroom 8B East Looking East from Centre Passageway 5) General View of Progress of Work in Potline 8A East 6) Potroom 8B East Looking East from Centre Passageway 7) Looking East from Centre Passageway Bldg 8A 8) Looking West from Centre Passageway Bldg 8A
Aerial photo of the Alcan aluminum smelter site, and the Douglas Channel. Taken from the north looking south. Note - bottom left corner is a portion of the Anderson Creek construction camp.