Photo depicts the men in charge of operations. From left is Vice President A.W. Whitaker Jr. seen sitting in a helicopter; Project Manager Percy E. Radley; Chief Resident Engineer John Kendrick. The three men are all taking a look at what could be a map.
Photo depicts the men in charge of operations. From left is Vice President A.W. Whitaker Jr. seen sitting in a helicopter; Project Manager Percy E. Radley; Chief Resident Engineer John Kendrick. The three men are all taking a look at what could be a map.
Image depicts a humorous reprieve certificate given to employees of the Alcan Project. The content also implies the hardships endured by the Morrison-Knudsen Company workers in Kemano.
Image depicts a humorous reprieve certificate given to employees of the Alcan Project. The content also implies the hardships endured by the Morrison-Knudsen Company workers in Kemano.
Notes
Title based on contents of text. Ernie Archer Collection
Photo depicts six people standing on the Kemano Wharf. From left is Mr. K. Roestad; Mr. Percy E. Radley; Mr. McNeely DuBose; Mrs. McNeely DuBose; Mr. M.K. Madsen, M.K. Assistant Project Manager and Mr. R.E. Reed, M.K. Area Engineer.
Photo depicts six people standing on the Kemano Wharf. From left is Mr. K. Roestad; Mr. Percy E. Radley; Mr. McNeely DuBose; Mrs. McNeely DuBose; Mr. M.K. Madsen, M.K. Assistant Project Manager and Mr. R.E. Reed, M.K. Area Engineer.
Photo depicts buildings at Anderson Hill Camp. Trailers and wash houses are in the foreground. The men's bunkhouses of Anderson Creek Camp are in the background.
Photo depicts buildings at Anderson Hill Camp. Trailers and wash houses are in the foreground. The men's bunkhouses of Anderson Creek Camp are in the background.
Notes
Title based on content of photograph. John Manders Collection
Photo depicts two barges moored in Douglas Channel and loaded with flat-top house sections for construction workers and their families.
Notes
Title based on content of photograph. -- Temporary housing destined for Kitimat was assembled at Vancouver Tug and Barge below the Lion's Gate Bridge in three sections, then barged to Kitimat - 10 houses or 30 sections on each barge. -- Electrician Bill Frahler wired approximately 2,000 houses in Kitimat camps and townsite between 1954 and 1958, working first for Johnson-Crooks then Straits Construction, both U.S. contractors. Pat Jimenez Collection
Photo depicts the extent of scaffolding for the beam and column construction along the upstream wall or "A-line". View is looking north from the inner end of the access tunnel.
Photo depicts the extent of scaffolding for the beam and column construction along the upstream wall or "A-line". View is looking north from the inner end of the access tunnel.
Notes
Title based on content of photograph. -- Alcan ID No. KR-1160. Alcan Collection
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212
Photo depicts two workers looking on as a Sikorsky S-55 helicopter brings in a load of supplies to the transmission line camp atop Kildala Pass.
Notes
Photographed by the International Harverster Company, manufacturers of construction equipment purchased for the Project. Hal Whiting Collection 985.65.82
Photo depicts Philip ("Flying Phil") Gaglardi, B.C. Minister of Highways at the Hirsch Creek section, during construction of Highway No. 25, Terrace to Kitimat. View is looking towards Terrace.
Photo depicts Philip ("Flying Phil") Gaglardi, B.C. Minister of Highways at the Hirsch Creek section, during construction of Highway No. 25, Terrace to Kitimat. View is looking towards Terrace.
Notes
Title based on content of photograph. Photograph appeared in the Northern Sentinel, August 24, 1956. Northern Sentinel Press Collection No. 2005.8.695.
Photo depicts construction of two pan-abode waiting rooms on the beach at Smeltersite for Pacific Western Airlines. A "Mallard" amphibian airplane unloads on the landing ramp in the background.
Photo depicts construction of two pan-abode waiting rooms on the beach at Smeltersite for Pacific Western Airlines. A "Mallard" amphibian airplane unloads on the landing ramp in the background.
Notes
Pan-Abode is interlocking red cedar building materials invented in 1948 in British Columbia. The builders of Kitimat chose innovative materials such as Pan-Abode for the town. Pan-Abode was used in some of the first prototype homes on Kitimat's first streets - Oriole, Pintail, and Partridge. It is also an efficient building material as a structure can be assembled very quickly. Northern Sentinel Press Collection. P00226.jpg
Photo depicts a unidentified man sitting on the Nechako River bank watching the the activities of construction of the dam at the canyon. Right bank stripping and left bank tunnel haul road shown.
Photo depicts a unidentified man sitting on the Nechako River bank watching the the activities of construction of the dam at the canyon. Right bank stripping and left bank tunnel haul road shown.
Notes
Title based on content of photo. -- A rock dam was chosen for its ability to withstand earthquakes. Morrison-Knudsen Company Collection
Photo depicts workers excavating for the construction of the alumina storage building.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-451. -- Sloping sides avoided cave-ins. -- Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.267