Photo depicts the exterior of the newly completed Nechako Centre in Kitimat, Shop Easy at the end of the complex. A bulldozer compacts the gravel - site preparation for the parking lot.
Photo depicts the exterior of the newly completed Nechako Centre in Kitimat, Shop Easy at the end of the complex. A bulldozer compacts the gravel - site preparation for the parking lot.
Notes
Title based on content of photograph. Part of Board of School Trustees Collection 982.91
Construction happening at city centre with a huge hole beside the Bank of Commerce. There is also a lot of construction equipment. The area in front of City Centre mall is boarded off and out of limits. City Centre Mall expansion construction.
1 photograph : b&w ; 10.4 x 12.6 cm
1 negative : b&w ; 9.9 x 12.5 cm
Scope and Content
Construction happening at city centre with a huge hole beside the Bank of Commerce. There is also a lot of construction equipment. The area in front of City Centre mall is boarded off and out of limits. City Centre Mall expansion construction.
Aerial of Kitimat's office building in the downtown area. The Royal Bank of Canada occupied the main floor, and Property and Power Operations for the Aluminum Company of Canada occupied an upper floor. Kildala Neighbourhood is shown in the background.
Aerial of Kitimat's office building in the downtown area. The Royal Bank of Canada occupied the main floor, and Property and Power Operations for the Aluminum Company of Canada occupied an upper floor. Kildala Neighbourhood is shown in the background.
Notes
Title based on content of photograph. Alcan Collection. Negative found in 2014.14 collection.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212
Photo depicts a unidentified man sitting on the Nechako River bank watching the the activities of construction of the dam at the canyon. Right bank stripping and left bank tunnel haul road shown.
Photo depicts a unidentified man sitting on the Nechako River bank watching the the activities of construction of the dam at the canyon. Right bank stripping and left bank tunnel haul road shown.
Notes
Title based on content of photo. -- A rock dam was chosen for its ability to withstand earthquakes. Morrison-Knudsen Company Collection