Photo showing view of Kitimat River Bridge looking west, east pier in foreground showing whalers in place with sheet piling driven to grade, in center: pier, and on right: two bearing piles driven to required bearing. On left, sixty foot pile in place for splicing, temporary bridge crew completing placing rock in pier.
Photo showing view of Kitimat River Bridge looking west, east pier in foreground showing whalers in place with sheet piling driven to grade, in center: pier, and on right: two bearing piles driven to required bearing. On left, sixty foot pile in place for splicing, temporary bridge crew completing placing rock in pier.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212