The crew of DC-3 casting machine raised the 15, 000 lb ingot containing the two millionth ton of aluminum production at Kitimat Works on October 14, 1966. Caption from article published in the Ingot. Asst. Works Manager T.L. "Bud" Gibson was on hand to congratulate DC-3 operator Manuel Trigo. Also shown in the photo from left are Bruno Unger, shift foreman, John Jeffrey, general foreman, Evaristo de Melo, asst. operator, Heinz Kaimbach, asst. op., Manuel DeCosta, shift foreman, Paul Loeffier, Op. slab saw, Mr. Gibson and Mr. Trigo; Casting Division Superintendent Jim Bell, Packaging and Shipping general foreman Bill Keith, day foreman Tony Coppens, Casting Superintendent Bob Reid, shift foreman Bernard Dicker, main. foreman Earl Welin and day foreman Helmut Benn. Dimensions of the ingot in the picture are 20 1/2" x 40" x 187". It weights 15, 147 lbs.
The crew of DC-3 casting machine raised the 15, 000 lb ingot containing the two millionth ton of aluminum production at Kitimat Works on October 14, 1966. Caption from article published in the Ingot. Asst. Works Manager T.L. "Bud" Gibson was on hand to congratulate DC-3 operator Manuel Trigo. Also shown in the photo from left are Bruno Unger, shift foreman, John Jeffrey, general foreman, Evaristo de Melo, asst. operator, Heinz Kaimbach, asst. op., Manuel DeCosta, shift foreman, Paul Loeffier, Op. slab saw, Mr. Gibson and Mr. Trigo; Casting Division Superintendent Jim Bell, Packaging and Shipping general foreman Bill Keith, day foreman Tony Coppens, Casting Superintendent Bob Reid, shift foreman Bernard Dicker, main. foreman Earl Welin and day foreman Helmut Benn. Dimensions of the ingot in the picture are 20 1/2" x 40" x 187". It weights 15, 147 lbs.
Photograph of 4-pole structure that will temporarily serve the electrical districtbution for the City Centre. Note the external steps on the South Side of the Alcan commecial building.
Photograph of 4-pole structure that will temporarily serve the electrical districtbution for the City Centre. Note the external steps on the South Side of the Alcan commecial building.
Photograph of view of the 11 man bunkhouses at the back of the motel site. Roofing is now being placed. These are prefab. units - went up in 6 days from dockside. Logs are laid in the foreground.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of view of the 11 man bunkhouses at the back of the motel site. Roofing is now being placed. These are prefab. units - went up in 6 days from dockside. Logs are laid in the foreground.
Photograph of aerial view of City Centre and neighbourhood C-I. Please note stripping in progress in City Centre. Douglas Channel visible in background. There is an arrow pointing to the lower right side with a note saying "fire was in this felled area shown here. Got partly into the standing timber also."
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of aerial view of City Centre and neighbourhood C-I. Please note stripping in progress in City Centre. Douglas Channel visible in background. There is an arrow pointing to the lower right side with a note saying "fire was in this felled area shown here. Got partly into the standing timber also."
Aerial view of Nechako Neighbourhood looking east. looking east. Note clearing for B-III on left side of picture and clearing for City Centre and Neighbourhood D on the right side.
Aerial view of Nechako Neighbourhood looking east. looking east. Note clearing for B-III on left side of picture and clearing for City Centre and Neighbourhood D on the right side.
Aerial view of the townsite clearing looking North. Note, City Centre in left foreground with clearing for main sewer outfall extending across to the lower right hand corner of photograph
Aerial view of the townsite clearing looking North. Note, City Centre in left foreground with clearing for main sewer outfall extending across to the lower right hand corner of photograph
Photograph of aerial view of west end of neighbourhood C-I and motel site A. Please note temporary housing units in left centre of photograph. Clearing shown in lower left corner is that for neighbourhood C Dyke.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of aerial view of west end of neighbourhood C-I and motel site A. Please note temporary housing units in left centre of photograph. Clearing shown in lower left corner is that for neighbourhood C Dyke.
Book titled "Aluminum Company of Canada, Ltd. Employee Training Division Montreal Trainee Manual", with a dark green cover, and an image of an aluminum ingot in the centre. Includes a letter from P. E. Radley to Mr. W.S. Mosher, explaining that this manual was sent as a sort of "guidebook" for British Columbia Employees, instead of a tour of the Eastern Canada plants.
Book titled "Aluminum Company of Canada, Ltd. Employee Training Division Montreal Trainee Manual", with a dark green cover, and an image of an aluminum ingot in the centre. Includes a letter from P. E. Radley to Mr. W.S. Mosher, explaining that this manual was sent as a sort of "guidebook" for British Columbia Employees, instead of a tour of the Eastern Canada plants.
Photograph of Boyles Brothers setting up their drilling equipment in the City Centre. A hundred foot test hole is to be placed in this location. There are four men visible working. A crane is in the background on the right.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of Boyles Brothers setting up their drilling equipment in the City Centre. A hundred foot test hole is to be placed in this location. There are four men visible working. A crane is in the background on the right.