This item is part of a large collection of photographs from Prince Rupert Daily News that was first transfered to the Prince Rupert City & Regional Archives. Images pertaining to Kitimat/Kemano were subsequently transfered to our repository
Scope and Content
Photograph of Kemano transformers and powerhouse - start of Alcan powergrid.
This item is part of a large collection of photographs from Prince Rupert Daily News that was first transfered to the Prince Rupert City & Regional Archives. Images pertaining to Kitimat/Kemano were subsequently transfered to our repository
"Bruno Munro, a five-year employee with Crown Zellerbach, began work after a two-month layoff Monday. Pictured above he is creating a road for parking and access to fuel tanks."
"Bruno Munro, a five-year employee with Crown Zellerbach, began work after a two-month layoff Monday. Pictured above he is creating a road for parking and access to fuel tanks."
Photo depicts the lettering over the main door to the powerhouse portal which reads "Aluminum Company of Canada Limited". Below are larger lettering spelling out "Kemano." A bar is bolted to the letters to give an underlining effect.
Photo depicts the lettering over the main door to the powerhouse portal which reads "Aluminum Company of Canada Limited". Below are larger lettering spelling out "Kemano." A bar is bolted to the letters to give an underlining effect.
Notes
Title based on content of photograph. -- Alcan ID No. KPO-243. To establish the best location for the word "Kemano", the letters were temporarily suspended with ropes. Alcan Collection
Photo depicts an aerial view of the powerhouse switchyard and entrance up to the 1600' level. The wide clearing on the right is the tram right-of-way. The powerhouse tailrace tunnel and channel and the access tunnel portal are in the centre, and the construction camp is on the left. Alcan Collection
Photo depicts an aerial view of the powerhouse switchyard and entrance up to the 1600' level. The wide clearing on the right is the tram right-of-way. The powerhouse tailrace tunnel and channel and the access tunnel portal are in the centre, and the construction camp is on the left. Alcan Collection
Photo depicts the pump floor inside the powerhouse. Workers are preparing to lift the Canadian General Electric uppershaft and rotor disks from the assembly platform.
Photo depicts the pump floor inside the powerhouse. Workers are preparing to lift the Canadian General Electric uppershaft and rotor disks from the assembly platform.
Notes
Title based on content of photograph. -- Alcan ID No. 5793. Alcan Collection