Photo depicts an aerial view of the powerhouse switchyard and entrance up to the 1600' level. The wide clearing on the right is the tram right-of-way. The powerhouse tailrace tunnel and channel and the access tunnel portal are in the centre, and the construction camp is on the left. Alcan Collection
Photo depicts an aerial view of the powerhouse switchyard and entrance up to the 1600' level. The wide clearing on the right is the tram right-of-way. The powerhouse tailrace tunnel and channel and the access tunnel portal are in the centre, and the construction camp is on the left. Alcan Collection
Photo depicts the Bailey Bridge across the inner end of the access tunnel with form work in the background. View is from a high elevation under the roof looking northwest.
Photo depicts the Bailey Bridge across the inner end of the access tunnel with form work in the background. View is from a high elevation under the roof looking northwest.
Notes
Title based on content of photograph. Alcan Collection
Photo depicts the extent of scaffolding for the beam and column construction along the upstream wall or "A-line". View is looking north from the inner end of the access tunnel.
Photo depicts the extent of scaffolding for the beam and column construction along the upstream wall or "A-line". View is looking north from the inner end of the access tunnel.
Notes
Title based on content of photograph. -- Alcan ID No. KR-1160. Alcan Collection
"Bruno Munro, a five-year employee with Crown Zellerbach, began work after a two-month layoff Monday. Pictured above he is creating a road for parking and access to fuel tanks."
"Bruno Munro, a five-year employee with Crown Zellerbach, began work after a two-month layoff Monday. Pictured above he is creating a road for parking and access to fuel tanks."
Photograph showing Warren Nesbit, Erich Zeller, John Watt, Doug Gilliland and Arvid Sestrop. The men are standing in the background of a large culvert. Farther in the background is a vehicle and a forest. The men are working on an access road into ski levels on Clague Mountain for the Chamber Commerce. They are rolling a 52", 20 ft long culvert into place.
Photograph showing Warren Nesbit, Erich Zeller, John Watt, Doug Gilliland and Arvid Sestrop. The men are standing in the background of a large culvert. Farther in the background is a vehicle and a forest. The men are working on an access road into ski levels on Clague Mountain for the Chamber Commerce. They are rolling a 52", 20 ft long culvert into place.
Notes
Discussion of the Clague Mountain access road appears in the Northern Sentinel on June 4th. The section on it has the caption "Road Work Starts" One mile of tote road has been cut through from the Mountain, Warren Nesbit, said today.
Work started Monday, Mr Nesbit stated, and volunteer crews have found conditions good for the preliminary work on the road which is planned to provide access to the ski slopes at the 1700 foot level on the mountain.
"It has been mostly cat work all the way so far" Mr Nesbit said. He is the chairman of the civic affair committee of the Chamber of Commerce, sponsor of the project.
Committee member Arv Sestrap has been in two or three times in a jeep. Mr Nesbit said. He added that the volunteers are attempting to get the road in shape so that trucks can haul gravel for the roadbed proper in the next few days.
George Irwin, president of the Kitimat Ski and Alpine Club is in charge of arranging crews for slashing and clearing the right of way. When the road has been built constructions of a ski-tow will be considered. Both will make the area an ideal recreation ground for Kitimat in summer and winter. All work on the project is voluntary.
Jamieson came to Kitimat from Vancouver to work on the Alcan project in 1952. With his first pay cheque he bought a small "Pony Kodak" camera at the local store (Hudson Bay?), and started taking coloured slides of the Kitimat from 1952-1953. Left Kitimat at the end of August 1953 to move to Montreal.
Scope and Content
Slide of conc. forms for bottom cell caisson 1, 2, and 3. Caisson 2 in fore.
Jamieson came to Kitimat from Vancouver to work on the Alcan project in 1952. With his first pay cheque he bought a small "Pony Kodak" camera at the local store (Hudson Bay?), and started taking coloured slides of the Kitimat from 1952-1953. Left Kitimat at the end of August 1953 to move to Montreal.
Scope and Content
Slide of conc. forms for bottom cells for caisson #1.