The crew of DC-3 casting machine raised the 15, 000 lb ingot containing the two millionth ton of aluminum production at Kitimat Works on October 14, 1966. Caption from article published in the Ingot. Asst. Works Manager T.L. "Bud" Gibson was on hand to congratulate DC-3 operator Manuel Trigo. Also shown in the photo from left are Bruno Unger, shift foreman, John Jeffrey, general foreman, Evaristo de Melo, asst. operator, Heinz Kaimbach, asst. op., Manuel DeCosta, shift foreman, Paul Loeffier, Op. slab saw, Mr. Gibson and Mr. Trigo; Casting Division Superintendent Jim Bell, Packaging and Shipping general foreman Bill Keith, day foreman Tony Coppens, Casting Superintendent Bob Reid, shift foreman Bernard Dicker, main. foreman Earl Welin and day foreman Helmut Benn. Dimensions of the ingot in the picture are 20 1/2" x 40" x 187". It weights 15, 147 lbs.
The crew of DC-3 casting machine raised the 15, 000 lb ingot containing the two millionth ton of aluminum production at Kitimat Works on October 14, 1966. Caption from article published in the Ingot. Asst. Works Manager T.L. "Bud" Gibson was on hand to congratulate DC-3 operator Manuel Trigo. Also shown in the photo from left are Bruno Unger, shift foreman, John Jeffrey, general foreman, Evaristo de Melo, asst. operator, Heinz Kaimbach, asst. op., Manuel DeCosta, shift foreman, Paul Loeffier, Op. slab saw, Mr. Gibson and Mr. Trigo; Casting Division Superintendent Jim Bell, Packaging and Shipping general foreman Bill Keith, day foreman Tony Coppens, Casting Superintendent Bob Reid, shift foreman Bernard Dicker, main. foreman Earl Welin and day foreman Helmut Benn. Dimensions of the ingot in the picture are 20 1/2" x 40" x 187". It weights 15, 147 lbs.
Photograph of view of the 11 man bunkhouses at the back of the motel site. Roofing is now being placed. These are prefab. units - went up in 6 days from dockside. Logs are laid in the foreground.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of view of the 11 man bunkhouses at the back of the motel site. Roofing is now being placed. These are prefab. units - went up in 6 days from dockside. Logs are laid in the foreground.
Aerial view of the smelter area looking north. Note rectifier buildings mainly closed in and roofing nearing completion. Potline footings are begining to extend east of the centre passageway.
Aerial view of the smelter area looking north. Note rectifier buildings mainly closed in and roofing nearing completion. Potline footings are begining to extend east of the centre passageway.
Photograph of aerial view of west end of neighbourhood C-I and motel site A. Please note temporary housing units in left centre of photograph. Clearing shown in lower left corner is that for neighbourhood C Dyke.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of aerial view of west end of neighbourhood C-I and motel site A. Please note temporary housing units in left centre of photograph. Clearing shown in lower left corner is that for neighbourhood C Dyke.
Photograph of Alcan art show at the Museum. Winners were Aerial Haun (1st.); Denise Newland (2nd); and Des Edwards (3rd). L-R in photo: Allan Hewitson (Alcan Public Relations), Ken Haun (accepted for his wife) and Des Edwards.
Photograph of Alcan art show at the Museum. Winners were Aerial Haun (1st.); Denise Newland (2nd); and Des Edwards (3rd). L-R in photo: Allan Hewitson (Alcan Public Relations), Ken Haun (accepted for his wife) and Des Edwards.
Photograph of Northern view of the company's guest houses on Albatross Avenue. One of the Oceanview apartments is visible to the left. In the front right, there is a man working with a pile of material next to him.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of Northern view of the company's guest houses on Albatross Avenue. One of the Oceanview apartments is visible to the left. In the front right, there is a man working with a pile of material next to him.
Photograph of #2 guest house showing installation of amdeck roofing. Three men visible working on the roof, one man is going down on a ladder, and another man is on the ground below. Building material is piled on the ground. Ground is very wet.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of #2 guest house showing installation of amdeck roofing. Three men visible working on the roof, one man is going down on a ladder, and another man is on the ground below. Building material is piled on the ground. Ground is very wet.
Photograph of #1 Guest House showing amdeck roofing in place. Two men are working on the roof, and two men are working on another structure on the left. Building material is laid on the ground around.