Skip header and navigation

Revise Search

2 records – page 1 of 1.

Deep excavation for the alumina storage building, smelter site

https://collections.kitimatmuseum.ca/en/permalink/description150
Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
July 30, 1953
Scope and Content
Photo depicts workers excavating for the construction of the alumina storage building.
Part Of
Kitimat Museum Website Collection
Creator
Alcan
Description Level
Item
Item Number
144
GMD
graphic material
Date Range
July 30, 1953
Physical Description
1 photograph : b&w
Scope and Content
Photo depicts workers excavating for the construction of the alumina storage building.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-451. -- Sloping sides avoided cave-ins. -- Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.267
Subject Access
Smelters
Images

Caisson Construction for Alcan dock

https://collections.kitimatmuseum.ca/en/permalink/description146
Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
April 30, 1953
Scope and Content
Photo depicts a view of caisson construction in their graving dock. The view is looking north at the timber bulkheads being installed.
Part Of
Kitimat Museum Website Collection
Creator
Alcan
Description Level
Item
Item Number
140
GMD
graphic material
Date Range
April 30, 1953
Physical Description
1 photograph : b&w
Scope and Content
Photo depicts a view of caisson construction in their graving dock. The view is looking north at the timber bulkheads being installed.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-342. Hal Whiting Collection 985.65.203
Subject Access
Smelters
Images