Negatives showing large steel parts for the mill and other steel structures that were on the Eurocan site after roughly the first 1.5 years of construction.
Negatives showing large steel parts for the mill and other steel structures that were on the Eurocan site after roughly the first 1.5 years of construction.
Negatives showing the earliest construction for the Eurocan Pulp & Paper Mill. Clearing of land and construction of dirt roads can be seen.
Notes
**IMPORTANT NOTE** - Negative slide sleeves are labelled as 2004.16.* , where * represents the item number in each series.
80001, 80003, 80004, 80006, 80011, 80013, 80017, 80045, 80047, 80052, 80054, 80058
"EUROCAN: General Construction at Eurocan Millsite."
"CONSTRUCTION has moved into high gear at the
Eurocan mill site as project manager Len Taylor
pushes to get walls up and roofs on before the snow
flies next fall. The camp population is climbing every
week as more crews come in to tackle
the construction jobs and as operating personnel are
taken on I strength. The piling job, part of which may
be seen in the foreground, is now going well and 6 is t-do-iwrds completed."
"EUROCAN: General Construction at Eurocan Millsite."
"CONSTRUCTION has moved into high gear at the
Eurocan mill site as project manager Len Taylor
pushes to get walls up and roofs on before the snow
flies next fall. The camp population is climbing every
week as more crews come in to tackle
the construction jobs and as operating personnel are
taken on I strength. The piling job, part of which may
be seen in the foreground, is now going well and 6 is t-do-iwrds completed."