Photographs of early Kitimat and Alcan smelter. Souvenir photobook with five photos.
Townsite with Mount Elizabeth in background. Smoke is visible beyond townsite in the forest. May 15, 1956.
Townsite with sandhill visible in background. May 15, 1956.
Main Road - Motel - Townsite. View of road leading from service centre into town. Kildala area cleared but not much is built. Kitimat River bridge visible at bottom. Aug 1955.
Kitimat Valley. View of Alcan site, hospital beach, and pier. Looking north.
Smeltersite. View of Alcan smelter and smeltersite.
Donated by Carol Larson. Originally belonged to her mother, Lydia Strecheniuk.
Scope and Content
Photographs of early Kitimat and Alcan smelter. Souvenir photobook with five photos.
Townsite with Mount Elizabeth in background. Smoke is visible beyond townsite in the forest. May 15, 1956.
Townsite with sandhill visible in background. May 15, 1956.
Main Road - Motel - Townsite. View of road leading from service centre into town. Kildala area cleared but not much is built. Kitimat River bridge visible at bottom. Aug 1955.
Kitimat Valley. View of Alcan site, hospital beach, and pier. Looking north.
Smeltersite. View of Alcan smelter and smeltersite.
Envelopes containing photos from broken down photo album of Kemano 1952/1953. Envelopes name which pages photos came from. Some envelopes have descriptions.
Page 2 - Camp 5
Page 3 - Camp V and its destruction
Page 4 - Horetsky Camp. Johnny after his helicopter accident - feed Sam
Page 6 - The first camp 5 before it burned (tents)
Page 7 - The Second Camp V
Page 8 - Camp V seen from camp VI
Page 11 - To 2600 feet camp
Page 12 - Camp V underclouds from camp 2600 feet without clouds
Page 15 - Camp 10 Chacha
Page 16 - At camp 2600
Page 21 - First party with the nurses
Page 23 - The first show all men cast
Page 24 - Sam is always hungry
Page 25 - Johnny, Marc, Arthur, Wally, John + Bill. Wonderful Times + Memories.
Page 26 - Cherjune? Cheyenne, Max, Larry.
Page 27 - Paula gentle friend, Gerrard, Max.
Page 28 - Waiting for the dining room to open.
Page 29 - Johnny + Tom
Page 30 - My roommate Anthony
Page 37 - Xmas day 1953
Page 40 - Kemano against Kitimat softball.
Collection also includes:
Envelope with paybills, receipts, clippings, and booklets.
Envelope with albun on adhesive sheet pg. 1
Envelope with photgraph with album.
Folder containing photcopies of album pages
Envelopes containing photos from broken down photo album of Kemano 1952/1953. Envelopes name which pages photos came from. Some envelopes have descriptions.
Page 2 - Camp 5
Page 3 - Camp V and its destruction
Page 4 - Horetsky Camp. Johnny after his helicopter accident - feed Sam
Page 6 - The first camp 5 before it burned (tents)
Page 7 - The Second Camp V
Page 8 - Camp V seen from camp VI
Page 11 - To 2600 feet camp
Page 12 - Camp V underclouds from camp 2600 feet without clouds
Page 15 - Camp 10 Chacha
Page 16 - At camp 2600
Page 21 - First party with the nurses
Page 23 - The first show all men cast
Page 24 - Sam is always hungry
Page 25 - Johnny, Marc, Arthur, Wally, John + Bill. Wonderful Times + Memories.
Page 26 - Cherjune? Cheyenne, Max, Larry.
Page 27 - Paula gentle friend, Gerrard, Max.
Page 28 - Waiting for the dining room to open.
Page 29 - Johnny + Tom
Page 30 - My roommate Anthony
Page 37 - Xmas day 1953
Page 40 - Kemano against Kitimat softball.
Collection also includes:
Envelope with paybills, receipts, clippings, and booklets.
Envelope with albun on adhesive sheet pg. 1
Envelope with photgraph with album.
Folder containing photcopies of album pages
John Ware was a past employee of the Kitimat Town Planning Department (1957-1959). He was hired by Hollister Kent, Planning Director for Kitimat. During his two years here, Dr. ware designed the first Kitimat street signs, the Haisla Boulevard overpass, and the Hirsch Creek Park shelter centennial project (1858-1958). He was layed off when Alcan lost major Aluminum buyers and the town expansion halted, resulting in a cut back of Kirtimat employees. He then moved to the USA.
Custodial History
Donated by John Ware.
Scope and Content
Photographs of preliminary colour perspective sketch designs for park shelters using aluminum components. Kitimat 1958.
John Ware was a past employee of the Kitimat Town Planning Department (1957-1959). He was hired by Hollister Kent, Planning Director for Kitimat. During his two years here, Dr. ware designed the first Kitimat street signs, the Haisla Boulevard overpass, and the Hirsch Creek Park shelter centennial project (1858-1958). He was layed off when Alcan lost major Aluminum buyers and the town expansion halted, resulting in a cut back of Kirtimat employees. He then moved to the USA.
Custodial History
Donated by John Ware.
Scope and Content
Photographs of multipurpose recreation building sketch perspectives. Kitimat.
Photographs consisting of images of men in Kitimat, water depth measuring stick, machinery, offices, buildings, Bank of Montreal, Boy Scouts camp, boy scouts flagpole, canoeing, boats, docks, Alcan construction, Delta King, trailers, Douglas Channel, Smeltersite, Smeltersite Project sign, Moore Creek falls, and Moore Creek bridge.
Photographs consisting of images of men in Kitimat, water depth measuring stick, machinery, offices, buildings, Bank of Montreal, Boy Scouts camp, boy scouts flagpole, canoeing, boats, docks, Alcan construction, Delta King, trailers, Douglas Channel, Smeltersite, Smeltersite Project sign, Moore Creek falls, and Moore Creek bridge.
Negatives showing aerials & ground images of the Eurocan Pulp & Paper Mill with visual signs of parts of the mill in operation. A couple negatives show the town of Kitimat with Eurocan in the distant background.
Negatives showing aerials & ground images of the Eurocan Pulp & Paper Mill with visual signs of parts of the mill in operation. A couple negatives show the town of Kitimat with Eurocan in the distant background.
John Ware was a past employee of the Kitimat Town Planning Department (1957-1959). He was hired by Hollister Kent, Planning Director for Kitimat. During his two years here, Dr. ware designed the first Kitimat street signs, the Haisla Boulevard overpass, and the Hirsch Creek Park shelter centennial project (1858-1958). He was layed off when Alcan lost major Aluminum buyers and the town expansion halted, resulting in a cut back of Kirtimat employees. He then moved to the USA.
Custodial History
Donated by John Ware.
Scope and Content
Photographs of Kitimat street and information signs. Aluminum and wooden mock-ups.
Six signs. Black & white. Bus Stop, Walkway, Taxi, W Capilano, Capilano S, and Osprey.
Six signs. Colour. Bus Stop, Walkway, Taxi, W Capilano, Capilano S, and Osprey.
Three signs with directional arrows. Black and white. City Centre, Nechako Centre, and Service Centre.
Three signs with directional arrows, installed. Black & white. Nechako Centre, City Centre, and Service Centre.
Six signs. Black and white. Parcel Pickup 3 Min Parking, Taxi, Commercial Loading No Parking, City Centre, Nechako Centre, and Service Centre.
Six signs. Colour. Parcel Pickup 3 Min Parking, Taxi, Commercial Loading No Parking, City Centre, Nechako Centre, and Service Centre.
Two signs, installed. Colour. Egret and Finch street signs installed.
Two signs, installed. Black & white. E Fourth, and Industrial S.
John Ware was a past employee of the Kitimat Town Planning Department (1957-1959). He was hired by Hollister Kent, Planning Director for Kitimat. During his two years here, Dr. ware designed the first Kitimat street signs, the Haisla Boulevard overpass, and the Hirsch Creek Park shelter centennial project (1858-1958). He was layed off when Alcan lost major Aluminum buyers and the town expansion halted, resulting in a cut back of Kirtimat employees. He then moved to the USA.
Custodial History
Donated by John Ware.
Scope and Content
Photographs of the Haisla Boulevard pedestrian walkway bridge. Photos include bridge before centre support was installed, and after.
Notes
Further info on the walkway bridge - the pedestrian overpass was designed by John Ware to carry people, heavy wet snow loads and walkway snow plow, with a large saftey factor. The central span was designed as the maximum length of concrete double 'Tee' beam that could be carried on an open flatbed railroad car through the Canadian Rocky Mountains. The pre-stressed central span was supported on each end by poured reinforced concrete cantilevers built clear of the multi-lane highway. Initial structural calculations were done out by the very capable Kitimat Town Engineer Graydon. His calculations were checked by Kitimat's consulting engineering firm in Vancouver. Ware's design and the engineer's calculations were then sent to a pre-stressed concrete manufacturer in Calgary. When the beam arrived it was properly installed between the two cantilevers, and metal handrails were added just before the winter snow arrived. The bridge was deseigned to self support without any needed centre support. However, when city officials saw the light looking long span walkway bridge they decided that it was too fragile and that a column must be placed at mid span to give it adequate support. This decision would result in a fatal vehicle accident, as wet snows caused a driver to lose control and crash into it.