Photo showing installation of the Screening Plant at Gravel Mountain almost complete on July 1st, each conveyor drops a seperate size stone directly over the enclosed conveyor belt on the ground. By opening the chutes visible on the top of the protective structure over the bet, any size stone can be selected for any purpose. Another conveyor, similiar to this will be installed at left, at a right angle to this one.
Photo showing installation of the Screening Plant at Gravel Mountain almost complete on July 1st, each conveyor drops a seperate size stone directly over the enclosed conveyor belt on the ground. By opening the chutes visible on the top of the protective structure over the bet, any size stone can be selected for any purpose. Another conveyor, similiar to this will be installed at left, at a right angle to this one.
Photo showing storage yard for material for construction on the Smeltersite Project, caisson docks at the back, potlines on the left, storage building in the middle.
Photo showing storage yard for material for construction on the Smeltersite Project, caisson docks at the back, potlines on the left, storage building in the middle.
Photo showing Harry Tomini on left, a resident engineer from the Aluminum Company of Canada and on right, F.T. Matthias, the assistant manager of the BC project from the Aluminum Company of Canada in Kemano.
Photo showing Harry Tomini on left, a resident engineer from the Aluminum Company of Canada and on right, F.T. Matthias, the assistant manager of the BC project from the Aluminum Company of Canada in Kemano.