Photo depicts Sam Hanna directing a crane operator in hoisting a crucible filled with molten aluminum on a potline.
Notes
Title based on content of photograph. -- Famed Canadian documentary photographer Malak Karsh was hired in the 1950s by Alcan to take photographs of Arvida and Kitimat. Many were published in Alcan literature and textbooks on Canada. A colourized version of this photograph appears in "The Story of British Columbia", The Story of Canada Series, 1966. Alcan Collection
The framework of the building with a crane lowering the last ceiling glue-lam beam into position while workers look on.
Notes
Title based on content of photograph. -- The Y.M.C.A. opened its doors in 1957. This lounge structure under construction is now the Community Room for the District of Kitimat Recreation Riverlodge facility. Alcan Collection 73.3.7.6
Photo depicts Philip ("Flying Phil") Gaglardi, B.C. Minister of Highways at the Hirsch Creek section, during construction of Highway No. 25, Terrace to Kitimat. View is looking towards Terrace.
Photo depicts Philip ("Flying Phil") Gaglardi, B.C. Minister of Highways at the Hirsch Creek section, during construction of Highway No. 25, Terrace to Kitimat. View is looking towards Terrace.
Notes
Title based on content of photograph. Photograph appeared in the Northern Sentinel, August 24, 1956. Northern Sentinel Press Collection No. 2005.8.695.
Photo depicts construction of two pan-abode waiting rooms on the beach at Smeltersite for Pacific Western Airlines. A "Mallard" amphibian airplane unloads on the landing ramp in the background.
Photo depicts construction of two pan-abode waiting rooms on the beach at Smeltersite for Pacific Western Airlines. A "Mallard" amphibian airplane unloads on the landing ramp in the background.
Notes
Pan-Abode is interlocking red cedar building materials invented in 1948 in British Columbia. The builders of Kitimat chose innovative materials such as Pan-Abode for the town. Pan-Abode was used in some of the first prototype homes on Kitimat's first streets - Oriole, Pintail, and Partridge. It is also an efficient building material as a structure can be assembled very quickly. Northern Sentinel Press Collection. P00226.jpg
Photo depicts the newly constructed dock, Terminal Wharf No. 1. View looking south-west from a point on the graving dock. Hydraulic fill dredge pipeline in the foreground running along at water level.
Photo depicts the newly constructed dock, Terminal Wharf No. 1. View looking south-west from a point on the graving dock. Hydraulic fill dredge pipeline in the foreground running along at water level.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-846. -- Note progress of conveyor gallery steel, kangaroo crane and pneumatic unloading equipment. Alcan Collection 78.11.68
Photo depicts the extent of scaffolding for the beam and column construction along the upstream wall or "A-line". View is looking north from the inner end of the access tunnel.
Photo depicts the extent of scaffolding for the beam and column construction along the upstream wall or "A-line". View is looking north from the inner end of the access tunnel.
Notes
Title based on content of photograph. -- Alcan ID No. KR-1160. Alcan Collection
Photo depicts workers excavating for the construction of the alumina storage building.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-451. -- Sloping sides avoided cave-ins. -- Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.267
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212