Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
8 photograph prints : b&w ; 7 x 10.5cm
12 photograph prints : b&w ; 8 x 8cm
7 photograph prints : b&w ; 12.5 x 9cm
1 photograph print : b&w ; 7.5 x 6.5cm
Custodial History
Photographs taken by Gisela Mendel in her role as museum curator.
Scope and Content
Photographs of David Cordellas house ; Beaver Pond ; Schack close to Minette bay ; Various Fossils ; Copper River Fossil Beds.
Notes
76.15.1 to 14 , 76.15.15.2 to 5 , 76.15.16.14 to 16 , 76.15.17 to 27 (Missing 76.15.21 to 23 and 25)
: Series number assigned as is due to these photographs being found at a later time after the collection was already entered into the database.
Aerial view of the smelter area looking north. Note rectifier buildings mainly closed in and roofing nearing completion. Potline footings are begining to extend east of the centre passageway.
Aerial view of the smelter area looking north. Note rectifier buildings mainly closed in and roofing nearing completion. Potline footings are begining to extend east of the centre passageway.