Photograph of aerial view of west end of neighbourhood C-I and motel site A. Please note temporary housing units in left centre of photograph. Clearing shown in lower left corner is that for neighbourhood C Dyke.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of aerial view of west end of neighbourhood C-I and motel site A. Please note temporary housing units in left centre of photograph. Clearing shown in lower left corner is that for neighbourhood C Dyke.
Photograph of the temporary housing site in neighbourhood C-1. Note the sections of the 210 units arriving in the building area. Crane at work on left.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of the temporary housing site in neighbourhood C-1. Note the sections of the 210 units arriving in the building area. Crane at work on left.
Photograph of view of the 11 man bunkhouses at the back of the motel site. Roofing is now being placed. These are prefab. units - went up in 6 days from dockside. Logs are laid in the foreground.
Donated by Jackie Worboys. Given to the Jackie Mufford Worboys family by Wally Melville.
Scope and Content
Photograph of view of the 11 man bunkhouses at the back of the motel site. Roofing is now being placed. These are prefab. units - went up in 6 days from dockside. Logs are laid in the foreground.
Photograph of aerial view looking north at the plant site, with H.M.C.S. Sioux at the wharf. Tide elevation is approximately 2.5 feet, and the extent of the dredge cut in the harbour can be clearly seen.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of aerial view looking north at the plant site, with H.M.C.S. Sioux at the wharf. Tide elevation is approximately 2.5 feet, and the extent of the dredge cut in the harbour can be clearly seen.
Photograph of view looking north along east boundary of the site of potlines 3 and 4 showing the dredge effluent ditch and the east edge of the hydraulic fill.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view looking north along east boundary of the site of potlines 3 and 4 showing the dredge effluent ditch and the east edge of the hydraulic fill.
Photograph of view looking west at bridge site showing Kitimat River at elevation 45. Centre pier of permanent bridge at right with formwork for final concrete pour.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view looking west at bridge site showing Kitimat River at elevation 45. Centre pier of permanent bridge at right with formwork for final concrete pour.
Looking north from sandhill (elev. 640 +) to site of permanent bridge center left, Townsite camp center right edge of photo, and Townsite ridge left to right.
Looking north from sandhill (elev. 640 +) to site of permanent bridge center left, Townsite camp center right edge of photo, and Townsite ridge left to right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.