Photo showing aerial view of the graving dock looking north showing caisson contruction nearing its final stages, the smelter site is in the background.
Photo showing aerial view of the graving dock looking north showing caisson contruction nearing its final stages, the smelter site is in the background.
Photo showing view looking north across Alumina Storage Building 504, forms being prepared for upper portion of east wall and dragline completing deep excavation at north end of building.
Photo showing view looking north across Alumina Storage Building 504, forms being prepared for upper portion of east wall and dragline completing deep excavation at north end of building.
Photo showing view looking east, showing bearing piles being driven in center pier and sheet piling in position for driving at east pier, traffic on temporary bridge.
1 photograph: b&w; 21.5 x 28 cm
1 negative : b&w ; 7 x 6 cm
Scope and Content
Photo showing view looking east, showing bearing piles being driven in center pier and sheet piling in position for driving at east pier, traffic on temporary bridge.
Photo showing view looking north west showing coal and coke bine adjacent to the carbon paste plant with truck dumping coke into hopper for feeding into the plant.
Photo showing view looking north west showing coal and coke bine adjacent to the carbon paste plant with truck dumping coke into hopper for feeding into the plant.
Photo showing view of the Carbon Paste Plant looking eat, smoke from stack showing first equipment in operation, erection of trusses for Conveyor C20 in progress.
Photo showing view of the Carbon Paste Plant looking eat, smoke from stack showing first equipment in operation, erection of trusses for Conveyor C20 in progress.