Photograph of aerial view looking north at the plant site, with H.M.C.S. Sioux at the wharf. Tide elevation is approximately 2.5 feet, and the extent of the dredge cut in the harbour can be clearly seen.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of aerial view looking north at the plant site, with H.M.C.S. Sioux at the wharf. Tide elevation is approximately 2.5 feet, and the extent of the dredge cut in the harbour can be clearly seen.
Photograph of view looking north along east boundary of the site of potlines 3 and 4 showing the dredge effluent ditch and the east edge of the hydraulic fill.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view looking north along east boundary of the site of potlines 3 and 4 showing the dredge effluent ditch and the east edge of the hydraulic fill.
Photo showing from left to right: Annabelle Bolton, Amelia Gray, Hanna Morrison, Gladys Amos, Grace Bolton, Maria Wilson, may queen and her attendants with band in back at Kitamaat Village
1 photograph: b&w; 9 x 12 cm
1 photograph: b&w; 9 x 12 cm
Scope and Content
Photo showing from left to right: Annabelle Bolton, Amelia Gray, Hanna Morrison, Gladys Amos, Grace Bolton, Maria Wilson, may queen and her attendants with band in back at Kitamaat Village
Notes
Same photo as 984.64.33 (R76-33) and 71.7.1.29. Annabelle Bolton married Woods, 2nd marriage Robinson at Hartley Bay. Amelia Gray married Grant. Hanna Morrison married Smith died 1969. Gladys Amos married Jonathon Morrison. Grace Bolton died tbc. Marian Wilson died unmarried. Kept extra photo that has marriage information.
Photograph of view looking west at bridge site showing Kitimat River at elevation 45. Centre pier of permanent bridge at right with formwork for final concrete pour.
Bill was one of the superintendents with Saguenay Kitimat.
Custodial History
Donated by Joanna Gallacher
Scope and Content
Photograph of view looking west at bridge site showing Kitimat River at elevation 45. Centre pier of permanent bridge at right with formwork for final concrete pour.