Photo showing officer commanding the second Canadian Minesweeping Squadron, Lieutenant Commander A.B. Torrie is seen on the bridge of his ship H.M.C.S. Fortune leading his squadron to Kemano, Monday. In the background can be seen H.M.C.S. James Bay Lieutenant Commander R. A. Orton, H.M.C.S. Miramichi Lieutenant Commander C. Cotaras and H.M.C.S. Cowichan Lieutenant Commander R. Okros. The squadron covered 54 nautical miles to Kemano in four hours easily.
Northern Sentinel - (A)Historical
(1)Royal Canadian Navy
(a)Personnel
Scope and Content
Photo showing officer commanding the second Canadian Minesweeping Squadron, Lieutenant Commander A.B. Torrie is seen on the bridge of his ship H.M.C.S. Fortune leading his squadron to Kemano, Monday. In the background can be seen H.M.C.S. James Bay Lieutenant Commander R. A. Orton, H.M.C.S. Miramichi Lieutenant Commander C. Cotaras and H.M.C.S. Cowichan Lieutenant Commander R. Okros. The squadron covered 54 nautical miles to Kemano in four hours easily.
Photograph of an aerial view of the Eurocan, Ocelot, and Alcan docks, as well as the Alcan plant. Kitimat River estuary visible on bottom right.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.
Photograph of an aerial view of the Eurocan, Ocelot, and Alcan docks, as well as the Alcan plant. Kitimat River estuary visible on bottom right.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.
Photograph of an aerial view of the Eurocan, Ocelot, and Alcan docks, as well as the Alcan plant. Kitimat River estuary visible on bottom right.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.
Photo showing aerial view of the graving dock looking north showing caisson contruction nearing its final stages, the smelter site is in the background.
Photo showing aerial view of the graving dock looking north showing caisson contruction nearing its final stages, the smelter site is in the background.
Photograph - aerial view of graving dock showing rough outline of excavation, Access Road into Dock at North West corner, and shovels, double handling base material.
Photograph - aerial view of graving dock showing rough outline of excavation, Access Road into Dock at North West corner, and shovels, double handling base material.
Aerial view of Graving Dock showing rough outline of excavation, Access Road into Dock at North West corner, and shovels, double handling base material.
Aerial view of Graving Dock showing rough outline of excavation, Access Road into Dock at North West corner, and shovels, double handling base material.
Photograph of the Alcan boat dock. Trucks, cranes, and other various equipment on the wooden dock structure. There is a man behind a pile of sacks in the centre.
Photograph of the Alcan boat dock. Trucks, cranes, and other various equipment on the wooden dock structure. There is a man behind a pile of sacks in the centre.