There is a road running across the base of the photograph, and a river running across the top right corner of the picture. In the middle is a patch of greenish brown trees with buildings and a straight road to the left of it.
There is a road running across the base of the photograph, and a river running across the top right corner of the picture. In the middle is a patch of greenish brown trees with buildings and a straight road to the left of it.
Photographs showing general ground and aerial shots of the Ocelot methanol plant throughout its construction.
Notes
7357-(13,14,16), 80-6-(008,011), 80-7-(051,052), 80-8-(069,073), 80-9-089, 81-01-(147,148,151), 81-03-(179,183,189,200), 81-04-208, Roll 14-No4, Roll 17-(No8,19), 81-07-(380,381,384), 81-09-(441,443,448,449,450), 81-10-(481 to 485,488,498,503,504,506 to 509), 31-9A, 82-03-(820 to 824), 82-06-(953,954,956,958,963,964), 82-07-(979 to 985), 82-08-(996,1001,1004,1006,1009,1014,1018,1035,1051,1056, 1082 to 1089), 82-09-(1118 to 1124), 82-10-(1165,1167,1168,1191,1192), 85-01-(1317,1325,1330), 85-05-(1350,1353,1354), 85-06-(1355,1356)
An Aerial view of the Ocelot site. There has yet to be any building construction. The photo shows only the clearing where Ocelot is intended to be built.
An Aerial view of the Ocelot site. There has yet to be any building construction. The photo shows only the clearing where Ocelot is intended to be built.