N/W corner of Smelter Site, looking east. North access road in left foreground. Area for service buildings in center foreground. Cold deck pile No. 1 in right foreground. Overburden disposal ramp in background.
N/W corner of Smelter Site, looking east. North access road in left foreground. Area for service buildings in center foreground. Cold deck pile No. 1 in right foreground. Overburden disposal ramp in background.
Photo showing the opening of a shoe repair shop called the Shoe Horn Shop in Nechako Centre opposite the food market and adjacent to the Kitimat Pharmacy, J. Swytik holding the door open,
Photo showing the opening of a shoe repair shop called the Shoe Horn Shop in Nechako Centre opposite the food market and adjacent to the Kitimat Pharmacy, J. Swytik holding the door open,
Patrons seated at the counter inside Sheardown's "Coffee Cup", located in the Nechako Centre. From left standing are staff members Susan Simmons, Armida Campbell, and Manager P.C. Staniforth.
Patrons seated at the counter inside Sheardown's "Coffee Cup", located in the Nechako Centre. From left standing are staff members Susan Simmons, Armida Campbell, and Manager P.C. Staniforth.
Notes
Title based on content of photograph. -- Northern Sentinel article, November 24, 1955. Northern Sentinel Press Collection