Skip header and navigation

Revise Search

3 records – page 1 of 1.

Permanent wharf construction site

https://collections.kitimatmuseum.ca/en/permalink/description300
Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
March 26, 1953
Scope and Content
Photo depicts the dredge and dragline excavating the channel from the dock to deep water, a truck dumping gravel for the foundation blanket into the bottom of a dump scow. The view looks toward the construction site for the permanent wharf from the south dike of the graving dock, crew bunkhouses of Smeltersite in the background.
Part Of
Kitimat Museum Website Collection
Description Level
Item
Item Number
294
GMD
graphic material
Date Range
March 26, 1953
Physical Description
1 photograph : b&w
Scope and Content
Photo depicts the dredge and dragline excavating the channel from the dock to deep water, a truck dumping gravel for the foundation blanket into the bottom of a dump scow. The view looks toward the construction site for the permanent wharf from the south dike of the graving dock, crew bunkhouses of Smeltersite in the background.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-320. Hal Whiting Collection 985.65.211
Subject Access
Construction
Wharves
Images

Caisson launching operation group

https://collections.kitimatmuseum.ca/en/permalink/description148
Part Of
Kitimat Museum Website Collection
Description Level
Item
GMD
graphic material
Date Range
May 15, 1953
Scope and Content
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Part Of
Kitimat Museum Website Collection
Description Level
Item
Item Number
142
GMD
graphic material
Date Range
May 15, 1953
Physical Description
1 photograph : b&w
Scope and Content
Photo depicts a group of men concerned with the caisson dock construction. From left is Messrs., Cam Jenkinson, George Malby, McCallum, Hal Whiting, J. B. Whitton, S. T. Wynne-Jones, Van Houten and Dick Hermann. View is of three floating caissons that were being towed into position for sinking, creating the smelter dock.
Notes
Title based on content of photograph. -- Alcan ID No. BC-2-362. -- Messrs. Jenkinson, Wynne-Jones, and Hermann all work for Alcan Engineering under the Resident Engineer George Malby. Messrs. J.B. Whitton and Van Houten work for the consulting firm of Frederick R. Harris & Co. of New York, N.Y. Hal Whiting was Project Manager, Kitimat Constructors, for smelter and town construction. Hal Whiting Collection 985.65.212
Name Access
Hermann, Dick
Jenkinson, Cam
Malby, George
McCallum, Mr.
Van Houten, Mr.
Whiting, Hal
Whitton, J. B.
Wynne-Jones, Mr.
Subject Access
Smeltersite
Alcan Smelters & Chemicals Ltd.
Images

Old Smeltersite School bus

https://collections.kitimatmuseum.ca/en/permalink/description11146
Part Of
Northern Sentinel Press Ltd Collection
Description Level
Item
GMD
graphic material
Date Range
29 August 1963
Accession Number
2005.8.1896
Scope and Content
Photo showing old Smeltersite School bus
Part Of
Northern Sentinel Press Ltd Collection
Description Level
Item
Accession Number
2005.8.1896
GMD
graphic material
Date Range
29 August 1963
Physical Description
1 photograph: b&w; 6" x 4"
Custodial History
Current: 1960s -Schools -Miscellaneous
Scope and Content
Photo showing old Smeltersite School bus
Subject Access
Smeltersite
Storage Location
Artifact Storage
Images