Photographs showing general ground and aerial shots of the Ocelot methanol plant throughout its construction.
Notes
7357-(13,14,16), 80-6-(008,011), 80-7-(051,052), 80-8-(069,073), 80-9-089, 81-01-(147,148,151), 81-03-(179,183,189,200), 81-04-208, Roll 14-No4, Roll 17-(No8,19), 81-07-(380,381,384), 81-09-(441,443,448,449,450), 81-10-(481 to 485,488,498,503,504,506 to 509), 31-9A, 82-03-(820 to 824), 82-06-(953,954,956,958,963,964), 82-07-(979 to 985), 82-08-(996,1001,1004,1006,1009,1014,1018,1035,1051,1056, 1082 to 1089), 82-09-(1118 to 1124), 82-10-(1165,1167,1168,1191,1192), 85-01-(1317,1325,1330), 85-05-(1350,1353,1354), 85-06-(1355,1356)
Photograph of aerial of the harbour facility near Alcan. The facility is at the centre left. The Alcan Plant is above, and the Kitimat River delta is below.
Photograph of aerial of the harbour facility near Alcan. The facility is at the centre left. The Alcan Plant is above, and the Kitimat River delta is below.
Notes
Back of photo has 2 dates, Jan 23 1985 and Jan 23 1986. The 1986 date is a sticker add on, while the 1985 date is stamped on. The 1985 date is believed to be correct.