Skip header and navigation

Revise Search

2 records – page 1 of 1.

Clearing for New Kitimat City Centre Extension

https://collections.kitimatmuseum.ca/en/permalink/description27548
Part Of
Gisela Mendel fonds
Description Level
File
GMD
graphic material
Date Range
[ca. 1978]
Accession Number
79.9
Scope and Content
Four photographs of a clearing & slash burning for the new Kitimat City Centre Extension (Summer 1978).
Part Of
Gisela Mendel fonds
Creator
Gisela Mendel
Description Level
File
Series Number
Series 1
Accession Number
79.9
GMD
graphic material
Responsibility
Gisela Mendel
Date Range
[ca. 1978]
Physical Description
3 photograph prints : b&w ; 12.5 x 17.5cm
Custodial History
Photographs taken by Gisela Mendel in her role as museum curator.
Scope and Content
Four photographs of a clearing & slash burning for the new Kitimat City Centre Extension (Summer 1978).
Notes
79.9.11.18 to 20
Subject Access
Kitimat
City Centre
Storage Location
Curator's Office

The clearing on the transmission line to Terrace for B.C Hydro

https://collections.kitimatmuseum.ca/en/permalink/description29501
Part Of
Northern Sentinel Press Ltd Collection
Description Level
Item
GMD
graphic material
Date Range
[2 June 1960]
Accession Number
2005.8.8525
Scope and Content
Photograph of the clearing on the trabsmission line right of way to Terrace from the B.C. Hydro is proceeding on scedule says Arthur Cope, super-intendant for Tidewater contracting LTD. The company holds the contract for clearing about 375 aces for the powerline right of way. With 105 men presently employed the clearing crew has reached it's peak, Mr.Cope said.
Part Of
Northern Sentinel Press Ltd Collection
Description Level
Item
Accession Number
2005.8.8525
GMD
graphic material
Date Range
[2 June 1960]
Physical Description
1 photograph : b&w ; 20 x 15 cm
Scope and Content
Photograph of the clearing on the trabsmission line right of way to Terrace from the B.C. Hydro is proceeding on scedule says Arthur Cope, super-intendant for Tidewater contracting LTD. The company holds the contract for clearing about 375 aces for the powerline right of way. With 105 men presently employed the clearing crew has reached it's peak, Mr.Cope said.
Name Access
Cope, Arthur