Building in Cleared Out Zone

https://collections.kitimatmuseum.ca/en/permalink/description29933
Part Of
Bill Frahler Collection
Description Level
Item
Date Range
1954
Accession Number
2003.32.125
Scope and Content
Lone building in a cleared out zone with two cars in front.
Part Of
Bill Frahler Collection
Creator
Bill Frahler
Description Level
Item
Accession Number
2003.32.125
Date Range
1954
Physical Description
1 slide : col.
Scope and Content
Lone building in a cleared out zone with two cars in front.
Part Of
Bill Frahler Collection
Description Level
Item
Date Range
1954
Accession Number
2003.32.253
Scope and Content
Cleared out area with hill and machinery on top.
Part Of
Bill Frahler Collection
Creator
Bill Frahler
Description Level
Item
Accession Number
2003.32.253
Date Range
1954
Physical Description
1 slide : col.
Scope and Content
Cleared out area with hill and machinery on top.
Part Of
Bill Frahler Collection
Description Level
Item
Date Range
1957
Accession Number
2003.32.22
Scope and Content
Cleared land with buildings and mountain in background.
Part Of
Bill Frahler Collection
Creator
Bill Frahler
Description Level
Item
Accession Number
2003.32.22
Date Range
1957
Physical Description
1 slide : col.
Scope and Content
Cleared land with buildings and mountain in background.
Part Of
Bill Frahler Collection
Description Level
Item
Date Range
1957
Accession Number
2003.32.23
Scope and Content
Cleared land with building lumber on it.
Part Of
Bill Frahler Collection
Creator
Bill Frahler
Description Level
Item
Accession Number
2003.32.23
Date Range
1957
Physical Description
1 slide : col.
Scope and Content
Cleared land with building lumber on it.

The clearing on the transmission line to Terrace for B.C Hydro

https://collections.kitimatmuseum.ca/en/permalink/description29501
Part Of
Northern Sentinel Press Ltd Collection
Description Level
Item
GMD
graphic material
Date Range
[2 June 1960]
Accession Number
2005.8.8525
Scope and Content
Photograph of the clearing on the trabsmission line right of way to Terrace from the B.C. Hydro is proceeding on scedule says Arthur Cope, super-intendant for Tidewater contracting LTD. The company holds the contract for clearing about 375 aces for the powerline right of way. With 105 men presently employed the clearing crew has reached it's peak, Mr.Cope said.
Part Of
Northern Sentinel Press Ltd Collection
Description Level
Item
Accession Number
2005.8.8525
GMD
graphic material
Date Range
[2 June 1960]
Physical Description
1 photograph : b&w ; 20 x 15 cm
Scope and Content
Photograph of the clearing on the trabsmission line right of way to Terrace from the B.C. Hydro is proceeding on scedule says Arthur Cope, super-intendant for Tidewater contracting LTD. The company holds the contract for clearing about 375 aces for the powerline right of way. With 105 men presently employed the clearing crew has reached it's peak, Mr.Cope said.