Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
D7 and H3 house. Living room, fireplace and hall leading to entrance hall and bathroom on right, furnace (grill enclosed), two bedrooms to left, and one bedroom at end of hallway.
D7 and H3 house. Living room, fireplace and hall leading to entrance hall and bathroom on right, furnace (grill enclosed), two bedrooms to left, and one bedroom at end of hallway.