Photograph showing the unloading of a prefabricated section of the new bunkhouse at the motel site. This section is one third of an elevan - man bunkhouse.
Photograph showing the unloading of a prefabricated section of the new bunkhouse at the motel site. This section is one third of an elevan - man bunkhouse.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.