Photo showing aerial view of the graving dock looking north showing caisson contruction nearing its final stages, the smelter site is in the background.
Photo showing aerial view of the graving dock looking north showing caisson contruction nearing its final stages, the smelter site is in the background.
Photo showing view of Kitimat River Bridge looking west, east pier in foreground showing whalers in place with sheet piling driven to grade, in center: pier, and on right: two bearing piles driven to required bearing. On left, sixty foot pile in place for splicing, temporary bridge crew completing placing rock in pier.
Photo showing view of Kitimat River Bridge looking west, east pier in foreground showing whalers in place with sheet piling driven to grade, in center: pier, and on right: two bearing piles driven to required bearing. On left, sixty foot pile in place for splicing, temporary bridge crew completing placing rock in pier.
Photographs show a log structure at Raley Creek (Jan 1980), Wadeene River Trapper's Cabin (Jan 1980), Eurocan pollution from Fire Mountain (11 Nov 1979), and Alcan from the Kitamaat Village (Feb 1980).
Photographs taken by Gisela Mendel in her role as museum curator.
Scope and Content
Photographs show a log structure at Raley Creek (Jan 1980), Wadeene River Trapper's Cabin (Jan 1980), Eurocan pollution from Fire Mountain (11 Nov 1979), and Alcan from the Kitamaat Village (Feb 1980).