Photo showing Mrs. Alice Backman in her new car that she won in the Elks Bingo which attracted more than 500 players. Giving her the keys is Bill Pound, leading knight of the Elks lodge and one of the Bingo organizers.
Northern Sentinel Box # 3- (A) Historical (I) Service Club (a) Benevolent Protective Order Of Elks
Scope and Content
Photo showing Mrs. Alice Backman in her new car that she won in the Elks Bingo which attracted more than 500 players. Giving her the keys is Bill Pound, leading knight of the Elks lodge and one of the Bingo organizers.
Photo showing "Jalopy" stays in Kitimat. Wally Melville buys Creed family's veteran automobile. In car: Wally Melville, wife Grace, daughter Aleta; Aubrey Creed and son Dio to the right.
Photo showing "Jalopy" stays in Kitimat. Wally Melville buys Creed family's veteran automobile. In car: Wally Melville, wife Grace, daughter Aleta; Aubrey Creed and son Dio to the right.
Possible farewell to someone. Man in white cap and naval suit carring a mock suitcase. Percy Radley (with pipe?), in doorway, Dale Madill and Jack Kendrick. Fellow in profile - Cronk, first postmaster
Possible farewell to someone. Man in white cap and naval suit carring a mock suitcase. Percy Radley (with pipe?), in doorway, Dale Madill and Jack Kendrick. Fellow in profile - Cronk, first postmaster
Photo showing 7 international L-190 trucks, complete with Jaegar ReadyMix Concrete Machines, first installment of a large fleet at Kitimat. In early June, these were waiting for completion of batching plant installation. They were used to carry concrete directly to the new smelter, townsite or any construction in progress. Batch plant location is at Gravel Mountain.
Photo showing 7 international L-190 trucks, complete with Jaegar ReadyMix Concrete Machines, first installment of a large fleet at Kitimat. In early June, these were waiting for completion of batching plant installation. They were used to carry concrete directly to the new smelter, townsite or any construction in progress. Batch plant location is at Gravel Mountain.
Photo showing a BE 22-B Trench Hoe digging the trench for sewer and water lines to the family quarters at the Kitimat Construction Camp. These were prefab buildings which were completed at the rate of two daily.
Photo showing a BE 22-B Trench Hoe digging the trench for sewer and water lines to the family quarters at the Kitimat Construction Camp. These were prefab buildings which were completed at the rate of two daily.