View of the bow of the Delta King while dry docked at the Alcan Smelter Site. Used as a temporary residence for Alcan workers. Preparations for refloating are in progress.
View of the bow of the Delta King while dry docked at the Alcan Smelter Site. Used as a temporary residence for Alcan workers. Preparations for refloating are in progress.
View of the Delta King stern while dry docked at the Alcan Smelter Site. Used as a temporary residence for Alcan Workers, preperations for re-floating are in progress.
View of the Delta King stern while dry docked at the Alcan Smelter Site. Used as a temporary residence for Alcan Workers, preperations for re-floating are in progress.
Aerial view South showing older section of Kitamaat Village at low tide. Upper left is community hall below which is Village Council Building and in centre of picture Village United Church.
1 photograph : b&w ; 19 x 19 cm
1 photograph : b&w ; 12 x 17 cm
1 photograph : b&w ; 22 x 27.5 cm
Scope and Content
Aerial view South showing older section of Kitamaat Village at low tide. Upper left is community hall below which is Village Council Building and in centre of picture Village United Church.
Aerial view of Kitamaat Village looking South. New houses in foreground leave extreme Southern tip of Village with sheltered point upper centre. At extreme right, Douglas Channel
1 photograph : b&w ; 19 x 19 cm
1 photograph : b&w ; 12 x 18 cm
1 photograhp : b&w ; 22 x 27.5 cm
Scope and Content
Aerial view of Kitamaat Village looking South. New houses in foreground leave extreme Southern tip of Village with sheltered point upper centre. At extreme right, Douglas Channel
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.
Smelter Site Looking East. Foreground, perforated Concrete Pipe for Ground Master Ditch. Middleground, Pre-cast Concrete Yard with Storage Stacks at right. Structural Steel partially complete in Service Buildings Lines D to M. Footings for Pot Line 2 at right.