Photograph of the $3,000,000 Kitimat hospital is sceduled to be called in mis December. It was designed by the Vanouver architectural firm of Thompson, Berwick and Pratt. The reinforced concrete structure will be built in two stages. Initial stage will provide 113 beds with services designed for 219 beds. It is included within the five storey structure that will be the public health facilities. In the foreground, and at right angles to the main hospital building, is the surgical wing under which is the single storey administration building. To the right is theproposed medical arts building to accommodate physicians, surgens, dentists and pharmacists. Hospital consultants for the project are Agnew, Craig and Peckham of Toronto. Completion of the first stage is sceduled for thr fall of 1959.
Photograph of the $3,000,000 Kitimat hospital is sceduled to be called in mis December. It was designed by the Vanouver architectural firm of Thompson, Berwick and Pratt. The reinforced concrete structure will be built in two stages. Initial stage will provide 113 beds with services designed for 219 beds. It is included within the five storey structure that will be the public health facilities. In the foreground, and at right angles to the main hospital building, is the surgical wing under which is the single storey administration building. To the right is theproposed medical arts building to accommodate physicians, surgens, dentists and pharmacists. Hospital consultants for the project are Agnew, Craig and Peckham of Toronto. Completion of the first stage is sceduled for thr fall of 1959.
Jamieson came to Kitimat from Vancouver to work on the Alcan project in 1952. With his first pay cheque he bought a small "Pony Kodak" camera at the local store (Hudson Bay?), and started taking coloured slides of the Kitimat from 1952-1953. Left Kitimat at the end of August 1953 to move to Montreal.