Photograph of guiding construction at Kenney Dam are (left to right) Harry Jomini, resident engineer for Aluminum Company of Canada, Ltd, and "Hak" Nielsen, general superintendent, and J.R. Bremner, project manager, for the contractor, Mannix Ltd, of Vancouver. Mannix Ltd is the sub-contractor for Morrison-Knudsen Company of Canada, Ltd. Sluicing down of dam's rock fill is going on in background.
Photograph of guiding construction at Kenney Dam are (left to right) Harry Jomini, resident engineer for Aluminum Company of Canada, Ltd, and "Hak" Nielsen, general superintendent, and J.R. Bremner, project manager, for the contractor, Mannix Ltd, of Vancouver. Mannix Ltd is the sub-contractor for Morrison-Knudsen Company of Canada, Ltd. Sluicing down of dam's rock fill is going on in background.
Jamieson came to Kitimat from Vancouver to work on the Alcan project in 1952. With his first pay cheque he bought a small "Pony Kodak" camera at the local store (Hudson Bay?), and started taking coloured slides of the Kitimat from 1952-1953. Left Kitimat at the end of August 1953 to move to Montreal.
Scope and Content
Slide of hydraulic fill. Smoke from Kitimat townsite in distance.
Photo showing up to 16 of these dynamite sticks were used for each of the explosions it took to blast open the beaver dam. Fuse and cap were inserted at the end of the stick. The fuse burns at the rate of about a foot per minute.
Current: 1960s
-District of Kitimat
-Miscellaneous
Scope and Content
Photo showing up to 16 of these dynamite sticks were used for each of the explosions it took to blast open the beaver dam. Fuse and cap were inserted at the end of the stick. The fuse burns at the rate of about a foot per minute.
Jamieson came to Kitimat from Vancouver to work on the Alcan project in 1952. With his first pay cheque he bought a small "Pony Kodak" camera at the local store (Hudson Bay?), and started taking coloured slides of the Kitimat from 1952-1953. Left Kitimat at the end of August 1953 to move to Montreal.
Scope and Content
Slide of 1,800,000 yd compacted fill on left and 2,000,000 yd hydraulic fill on right.