Saskwa River Bridge. Length over all 177 feet, clear span 67 feet. Built by Survey Party in 2 1/2 days. 100 horses and mules crossed the following morning. Current 10 miles per hour.
In 1899 J.S. O'Dwyer, engineer in charge of a Canadian Department of Railways and Canals survey party, found the bridge over the Suskwa near its Junction with the Bulkley washed away. Using the Indigigenous methods of the cantilever principle he and his men built a bridge 177 feet long, with a clear span of 67 feet, in just two days. The bridge was crossed successfully by loo horses and mules apparently at mile 4
Saskwa River Bridge. Length over all 177 feet, clear span 67 feet. Built by Survey Party in 2 1/2 days. 100 horses and mules crossed the following morning. Current 10 miles per hour.
In 1899 J.S. O'Dwyer, engineer in charge of a Canadian Department of Railways and Canals survey party, found the bridge over the Suskwa near its Junction with the Bulkley washed away. Using the Indigigenous methods of the cantilever principle he and his men built a bridge 177 feet long, with a clear span of 67 feet, in just two days. The bridge was crossed successfully by loo horses and mules apparently at mile 4
Photographs of bridge over Kitimat River replacing one taken out by a flood. Bunch of trees and debrees caught up on bottom of bridge. Two men are standing up on the bridge.
Fred DeLory worked for Arvida P.Q. and was transferred to Kitimat at the beginning of 1952. He was the first town engineer.
Scope and Content
Photographs of bridge over Kitimat River replacing one taken out by a flood. Bunch of trees and debrees caught up on bottom of bridge. Two men are standing up on the bridge.
Photographs of Kitamaat village taken from air over the camp. What appears to be a road going over the mountain is actually the clearing for the transmission line going to Kemano 49.6 miles away. Smoke is caused by burning off slack.
Fred DeLory worked for Arvida P.Q. and was transferred to Kitimat at the beginning of 1952. He was the first town engineer.
Scope and Content
Photographs of Kitamaat village taken from air over the camp. What appears to be a road going over the mountain is actually the clearing for the transmission line going to Kemano 49.6 miles away. Smoke is caused by burning off slack.
Saskwa River Bridge. Length over all 177 feet, clear span 67 feet. Built by Survey Party in 2 1/2 days. 100 horses and mules crossed the following morning, current 10 miles per hour.
Saskwa River Bridge. Length over all 177 feet, clear span 67 feet. Built by Survey Party in 2 1/2 days. 100 horses and mules crossed the following morning, current 10 miles per hour.