Jamieson came to Kitimat from Vancouver to work on the Alcan project in 1952. With his first pay cheque he bought a small "Pony Kodak" camera at the local store (Hudson Bay?), and started taking coloured slides of the Kitimat from 1952-1953. Left Kitimat at the end of August 1953 to move to Montreal.
Jamieson came to Kitimat from Vancouver to work on the Alcan project in 1952. With his first pay cheque he bought a small "Pony Kodak" camera at the local store (Hudson Bay?), and started taking coloured slides of the Kitimat from 1952-1953. Left Kitimat at the end of August 1953 to move to Montreal.
Scope and Content
Slide of caissons 2 and 3 just before floating. Kitimat.
Jamieson came to Kitimat from Vancouver to work on the Alcan project in 1952. With his first pay cheque he bought a small "Pony Kodak" camera at the local store (Hudson Bay?), and started taking coloured slides of the Kitimat from 1952-1953. Left Kitimat at the end of August 1953 to move to Montreal.
Scope and Content
Slide of 3 cats pushing away gravel at end of hydraulic dredge.
Photograph of surveying, drilling test tubes. First visible sign of building the hospital. Henry Janzen (left) and Bod McNaughton, employees of Hardy and Ripley soil consultants, determine conditions of the sub-soil on site chosen for the proposed building. Examination done by means of a pent 1-0 meter.
Photograph of surveying, drilling test tubes. First visible sign of building the hospital. Henry Janzen (left) and Bod McNaughton, employees of Hardy and Ripley soil consultants, determine conditions of the sub-soil on site chosen for the proposed building. Examination done by means of a pent 1-0 meter.
Photograph of drill rig no.3 moving into position for dock drilling. E/W mole in left background. Rigs No.1 and 2 and water scow in position, right background. One right there are two bulldozers visible, as well as some workers.
Bud Powell is a longtime resident of Kitimat and former smeltersite resident. He worked for Alcan.
Custodial History
Donated by Bud Powell.
Scope and Content
Photograph of drill rig no.3 moving into position for dock drilling. E/W mole in left background. Rigs No.1 and 2 and water scow in position, right background. One right there are two bulldozers visible, as well as some workers.
Photo showing general view of the site of Potlines #3 and 4 looking south east, Moore creek channel in foreground and dredge pipe discharging at left centre.
Photo showing general view of the site of Potlines #3 and 4 looking south east, Moore creek channel in foreground and dredge pipe discharging at left centre.